摘要
基于平衡计分卡理论,结合水电站运行的实际情况,分析了水电站运行的影响因素,建立了小水电运行效率评估指标体系。利用AHP法进行了3个小水电站工程运行效率的评价。实例分析验证了建立的评估指标体系的合理可行性。
In this paper, based on balanced scorecard theory and the actual situation of hydropower stations, the factors that influence the operation of hydropower station are analyzed. The evaluation index system for small hydropower operation efficiency is estab- lished, and the operation efficiency of three small hydropower stations is evaluated by means of AHP method. The case study shows that the evaluation index system for small hydropower operation efficiency is reasonable.
出处
《中国农村水利水电》
北大核心
2013年第9期130-133,共4页
China Rural Water and Hydropower
基金
国家自然科学基金(51179061)
"十二五"国家科技支撑计划(2012BAD10B02)
关键词
小水电
运行效率
平衡计分卡
评估指标体系
AHP法
small hydropower
operation efficiency
balanced scorecard
evaluation index system
AHP method
作者简介
宋小波(1989-),男,硕士研究生,研究方向为水电站运行。E—mail:sxb5566jl@126.com。