摘要 针对高应力软岩巷道底鼓治理的难题,采用FLAC数值模拟软件建立模型,制订3个不同控底方案开展研究,全面对比分析了高应力软岩巷道围岩变形规律。研究结果表明,加固高应力软岩巷道底板,能有效控制软岩巷道底鼓,顶帮底同治能优化围岩的承载结构,使得顶帮底协调承载,并给出了锚索帮部补强的锚注一体化底板加固方案,保障了高应力软岩巷道长期安全稳定。该方案成功应用于现场,效果良好。 Aiming at the problems of floor heave control of soft roadway with high stress, FLAC software was used to establish simulation model, and three plans of floor heave control were proposed to carry out research. Deformation of soft roadway with high stress was ana- lyzed contrastively. The results show that floor strengthening can effectively control floor heave, and roof-side-floor controlling can opti- mize the bearing of surrounding rock with roof-side-floor coordinating with each other. Floor reinforcement scheme of the integrity of the bolting and grouting anchor was put forward with both sides strengthened by cables, so as to ensure the high-stress soft rock roadway in long-term security and stability. The scheme was put into practice successfully, and achieved good control effects.
作者 杨建明
出处 《中州煤炭》 2013年第8期65-67,共3页 Zhongzhou Coal
关键词 高应力 软岩 底鼓 注浆锚杆 围岩控制 high stress soft rock floor heave grouting bolt surrounding rock control
作者简介 杨建明(1969-),男,江苏如皋人,工程师,2011年毕业于中国矿业大学,现任保利能源荣欣公司高家庄煤矿副矿长。
  • 相关文献

参考文献9

二级参考文献115

共引文献3079

同被引文献13

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部