2MERNA,A.,SMITH,N.J.Bid evaluation for UK public sector construction contracts[J].Proceedings of the Institution of Civil Engineers (London),1990,88:91-105.
3CROWLEY LG,HANCHER DE.Risk assessment of competitive procurement[J] Journal of Construction Engineering and Management,1995,121(2):230-237.
4WEI-CHIH WANG,HAN-HSIANG WANG,YU-TING LAI,et al.Unit-price-based model for evaluating competitive bids[J].International Journal of Project Management,2006,24:156-166.
5HIYASSAT,M.A.S.Construction bid price evaluation[J].Canadian Journal of Civil Engineering,2001,28(2):264-270.
6HERBSMAN ZOHAR,ELLIS RALPH.Multiparameter bidding system-innovation in contract administration[J] Journal of Construction Engineering and Management,1992,118(1):142-150.
7LIU,S.L,LAI,K.K.,WANG,S.Y.Multiple criteria models for evaluation of competitive bids[J].Journal of Mathematics Applied in Business and Industry,2000,11(3):151-160.
8Y.ILKER TOPCU.A decision model proposal for construction contractor selection[J].Turkey Building and Environment,2004,39:469-481.
9WEN-LIN TZENG.JOHN CHIEN-CHUNG LI,TZU-YING CHANG.A study on the effectiveness of the most advantageous tendering method in the public works of Taiwan[J].International Journal of Project Management,2006,24:431-437.
10ABDULLAH M.ASSUAGERS.Framework ror evaluating bids of construction contractors[J].Journal of Management in Engineering,1999,15(2):72-78.