摘要
鲁地拉水电站上游过水围堰采用土石—碾压混凝土混合过水围堰,该围堰建在深厚覆盖层上,具有大流量、高水头、长历时的过水特点。围堰建成后,经历3个汛期过水考验,运行良好。本文介绍该围堰的设计与运行情况,可供其他工程参考。
The upstream overflow cofferdam for construction of Ludila Hydropower Station is an earth-rockfill-roller compacted concrete combined one, which is on a deep overburden layer and has the overflow characteristics of large flow rate, high head and long duration. After the completion, it experiences the overflows from three flood seasons with a better operation status. The design and operation of the cofferdam are described herein, so as to provide a reference for the other similar project.
出处
《水利水电技术》
CSCD
北大核心
2013年第6期86-89,共4页
Water Resources and Hydropower Engineering
关键词
鲁地拉水电站
过水围堰
大流量
高水头
长历时
Ludila Hydropower Station
overflow cofferdam
large flow rate
high head
long duration
作者简介
康文军(1981-),男,工程师。