期刊文献+

不同缺货策略下非线性再制造供应链系统动态行为 被引量:3

Dynamic Behavior of Nonlinear Remanufacturing Supply Chain System under Different Shortage Policies
在线阅读 下载PDF
导出
摘要 为研究非线性约束下有缺货和无缺货两种策略对再制造供应链系统动态行为的影响,建立了不可退货、供货受制于当前供货服务水平且回收产量受最大回收能力限制的更符合实际情况的非线性系统模型。依据混沌动力学原理和方法,借助相图对两种缺货策略下非线性系统的动力学行为进行了仿真分析;进一步采用分岔图和最大李亚普诺夫指数对比了不同缺货策略下逆向环节参数对系统行为的影响。数值模拟结果表明,无论系统中有缺货还是无缺货,非线性约束都不是导致系统产生复杂混沌行为的充分条件;此外,除再制造提前期外,其它参数处于不同范围时,有缺货和无缺货策略各有优劣,需要根据管理目标和参数取值,选择适当的缺货策略。 In order to investigate the impacts of two shortage policies, namely with and without shortage, on dynamic behavior of remanufacturing supply chain system under nonlinear constraints, a more realistic model is proposed based on constraints of forbidden returning, finite supply service level, and maximum recoverable capacity. According to the principles of chaotic dynamics, the dynamic behavior of nonlinear system under the two shortage policies is analyzed with the aid of phase diagram. Moreover, the influences of some backward parameters under different shortage policies on system dynamics are compared by bifur- cation map and the maximum Lyapunov exponent. Simulation results show that nonlinear constraints do not inevitably lead to the chaotic behavior no matter what shortage policy is applied. A system with shortage is not strictly superior to the system without shortage and vice versa, when the value of backward system pa- rameters changes, except as remanufacturing lead-time parameter. The appropriate shortage policy should be selected according to management objectives and the value of parameters.
作者 贾经冬 王晶
出处 《工业工程》 北大核心 2013年第2期34-40,58,共8页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70872009)
关键词 再制造 供应链 非线性 动态行为 remanufacturing supply chain nonlinear dynamic behavior
作者简介 贾经冬(1975-),女,湖北省人,讲师,博士研究生,主要研究方向为物流与供应链管理和软件项目管理.
  • 相关文献

参考文献15

  • 1Fleischmann M, Bloemhof-Ruwaard J M, Dekker R, et al. Quantitative models for reverse logistics: a review[ J ]. Euro- pean Journal of Operational Research, 1997,103 ( 1 ) : 1-17.
  • 2尤建新,隋明刚.闭环供应链的经济学解释[J].同济大学学报(社会科学版),2005,16(5):102-106. 被引量:28
  • 3黄小原,邱若臻.基于再制造的闭环供应链动态模型及其鲁棒H_∞控制[J].控制与决策,2007,22(6):667-669. 被引量:25
  • 4Savaskan R C, Bhattacharya S, Van Wassenhove L N. Closed-loop supply chain models with product remanufactur- ing [ J ]. Management Science, 2004, 50 (2) : 239- 252.
  • 5Van der laan E, Salomon M. Production planning and inven- tory control with remanufacturing and disposal[ J ]. European Journal of Operational Research, 1997,102 (2) :264-278.
  • 6Minner S, Kleber R. Optimal control of production and re- manufacturing in a simple recovery model with linear cost function[J]. OR Spektrum, 2001, 23(1):3-24.
  • 7Nakashima K, Arimitsu H,Nose T, et al. Optimal control of a remanufacturing system [ J ]. Internation Journal Production Research, 2004, 42 (17) :3619-3625.
  • 8计国君,黄位旺.回收条例约束下的再制造供应链决策[J].系统工程理论与实践,2010,30(8):1355-1362. 被引量:37
  • 9周明,关新国.再利用比例对闭环供应链利润的影响分析[J].工业工程,2009,12(1):51-54. 被引量:2
  • 10Tang O, Naim M M. The impact of information transparen- cy on the dynamic behavior of a hybrid manufacturing/re- manufacturing system [ J ]. International Journal of Produc- tion Research, 2004,42(19) : 4135-4152.

二级参考文献56

共引文献88

同被引文献44

  • 1朝克,朱龑.库存能力限制下的物流配送中心选址研究[D].内蒙古工业大学学报,2014,27,(4):76-80.
  • 2Zuckerman A.Compaq switches to pre-position inventorymodel[J].World Trade,2000,13(4):72-74.
  • 3Barnes E,Dai J,Deng Shijie.On the strategy of supplyhubs for cost reduction and responsiveness[R].Singapore:National University of Singapore,2000.
  • 4Shah J,Goh M.Setting operating policies for supply hubs[J].International Journal of Production Economics,2006,100(2):239-252.
  • 5Pundoor G,Chen Z L.Joint cyclic production and deliveryscheduling in a two-stage supply chain[J].InternationalJournal of Production Economics,2009,119(1):55-74.
  • 6Yu G,Qi X T.Disruption management:framework,modelsand application[M].[S.l.]:World Scientific Publishing Company,2004.
  • 7Clausen J,Larsen A,Larsen J,et al.Disruption managementin the airline industry-concepts,models and methods[J].Computers & Operations Research,2010,37(5):809-821.
  • 8Castro A J M,Oliveira E.A new concept for disruptionmanagement in airline operations control[J].Journal ofSerospace Engineering,2011,225(G3):269-290.
  • 9Qi X T,Bard J F,Yu G.Supply chain coordination withdemand disruption[J].Omega,2004,32(4):301-312.
  • 10Terry L.Friesz,Guest Editor.Supply chain disruption andrisk management[J].Transportation Research Part B:Methodological,2011,45(8):1125-1127.

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部