无底柱分段崩落法在获各琦铜矿顶柱回收中的应用 被引量:3

Application of non-pillar sublevel caving metod for top pillar recovery in Huogeqi Copper Mine
在线阅读 下载PDF
导出
摘要 为了安全地回收获各琦铜矿1 690m中段各个采场顶柱,并为其它采场顶柱回收提供经验,选定1 690m中段901采场作为试验采场,并采用无底柱分段崩落法对其顶柱进行回收。实践证明,无底柱分段崩落法能够安全、有效地回收顶柱,并且损失率和贫化率等各项指标均达到设计要求,并为回收其他类似采场顶柱提供借鉴。 In order to safely recover top pillars of each stope at the depth ot 1690m in kiuogeql Copper Mine, and provide experience for pillar recovery of other stope, 901 Stope at the depth of 1690 m is selected as experimental stope and no-pillar sublevel caving is used to recover its top pillar. The practice proved that this method can safely and effectively recover the top pillar; the loss rate, dilution rate and other indicators can meet the design requirements, which provide a reference in recovering of other similar top pillars.
作者 綦晓磊
出处 《有色金属(矿山部分)》 2013年第2期19-21,共3页 NONFERROUS METALS(Mining Section)
关键词 顶柱回收 采场 分段崩落法 top pillar recovery stope sublevel caving method
作者简介 綦晓磊(1983-),男,助理工程师,采矿工程专业,主要从事采矿设计及技术管理工作。
  • 相关文献

参考文献7

二级参考文献28

共引文献103

同被引文献10

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部