期刊文献+

三峡水库发电优化调度分层嵌套模型研究 被引量:3

Study on Optimal Generation Dispatching of Three Gorges Reservoir Based on Layered Nesting Model
在线阅读 下载PDF
导出
摘要 依据三峡水库实际运行条件,提出了长中短期多时间尺度分层结构与相互嵌套原理,构建了不同层次模型之间的逐级控制策略和信息反馈机制,建立了基于发电收益最大的三峡水库4层嵌套发电优化调度模型及其求解方法。实例表明,所建立模型能较好地体现不同层次模型之间的"控制—反馈"关系和不同精度来水的信息价值。 Based on actual operation conditions of Three Gorges Reservoir, the principle of multi-time scale layered nesting is firstly proposed, then the level-control strategies and feedback mechanisms between different time-scale models are built, and finally, the 4-layer nesting model and its solution for seeking operation optimization of reservoir with maximum power gain is established. The case study shows that the model can reflect on the relationship of control-feedback and the value of different accuracy runoff.
出处 《水力发电》 北大核心 2013年第4期65-68,共4页 Water Power
关键词 优化调度 分层嵌套模型 三峡水库 optimal dispatching layered nesting model Three Gorges Reservoir
作者简介 张梦然(1988-),女,安徽巢湖人,硕士,主要从事水资源研究与管理工作
  • 相关文献

参考文献14

二级参考文献65

共引文献163

同被引文献53

引证文献3

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部