工程项目群风险管理系统思维模式研究 被引量:5

Study on systematic thinking mode of engineering program risk management
在线阅读 下载PDF
导出
摘要 项目群是一类特殊的复杂系统,其风险管理中的互动关系更为复杂。目前工程项目群风险管理的思维模式是以惯性思维、经验思维和定式思维为主的分割式思维,对复杂问题的分析与观察角度单一,缺乏系统的规划。在分析了工程项目群风险管理分割式思维模式局限性的基础上,引入复杂科学管理系统思维模式,构建了工程项目群风险管理的系统思维模式,并对该模式的应用作了详细分析。结果表明,该模式的应用可为全面、系统地进行工程项目群风险管理提供保障。 Program group is a kind of specific complex system, and the interactions are more complicated in risk management of projects. With the disadvantages of single analysis and observation angle, coupled with lack of systematic planning, the think- ing mode towards risk management of program group belongs to partitioned thinking mainly based on inertial thinking, empirical thinking and fixed thinking. The mode of complex program group risk management is introduced, the systematic thinking mode is constructed, and its application is elaborated as well after the analysis of limitations of the thinking mode. The result shows that the application of the mode can provide guarantee for carrying out program risk management systematically and comprehensively.
出处 《人民长江》 北大核心 2013年第5期103-106,共4页 Yangtze River
关键词 风险管理 工程项目群 复杂科学管理 系统思维模式 risk management program group of projects complex scientific management systematic thinking mode
作者简介 江新,男,教授,硕士生导师,研究方向为工程管理、系统决策理论及评价。E—mail:jiangxl63@163.com
  • 相关文献

参考文献5

二级参考文献25

  • 1向鹏成,任宏.国际工程承包风险的模糊综合评价[J].数学的实践与认识,2005,35(6):30-34. 被引量:11
  • 2David Baccarini,The concept of project complexity-a review.International Journal of Project Nanagement,Vol 14,No.4, 1996.
  • 3John H Psyne, Rodney Turner, Company -wide project management :the planning and control of programmes of projects of different type.International Journal of Project Nanagement,Vol 17,No.1,1999.
  • 4杨建平,杜端甫.重大工程项目风险管理中的综合集成方法[J].http://www.21training.org/ipmp/ziliao.
  • 5Dathy Schwalbe,Information Technology Projectman—agement[M].北京:机械工业出版社,2003.
  • 6Hunter J,Serguieva A.Project risk evaluation using an alternative to the standard present value criteria[J].NeuralNetwork World,2000,10(1):157-172.
  • 7Rezaie K,Amalnik M S,Gereie A,et al.Using extended Monte Carlo simulation method for the improvement of riskmanagement:Consideration of relationships between uncertainties[J].Applied Mathematics and Computation,2007,190(2):1 492-1 501.
  • 8Sadeghi N,Fayek A R,Pedrycz W.Fuzzy Monte Carlo simulation and risk assessment in construction[J].Computer-Aided Civil and Infrastructure Engineering,2010,25(4):238-252.
  • 9Ipsilandis P,Samaras G,Mplanas N.A multicriteria satisfaction analysis approach in the assessment of operationalprogrammes[J].International Journal of Project Management,2008,26(6):601-611.
  • 10马四海,贺文慧,杨秋林.BOT项目风险模糊综合评价模型及其应用[J].技术经济,2007,26(12):78-82. 被引量:6

共引文献51

同被引文献46

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部