330MW循环流化床屏式受热面超温分析和预防措施 被引量:5

Cause Analysis and Precautionary Measure of Platen Surface Overheating of 330MW CFB
原文传递
导出
摘要 结合国华宁东电厂2台330 MW循环流化床锅炉在低负荷运行区段,屏式受热面易发生超温现象,分析主要原因是:在此负荷阶段床温的辐射热量大,而蒸汽流量相对较少所致;同时因设备故障或运行调整不当使床温失去控制,也是重要因素。对此锅炉厂主要从提高管壁材质和改变耐火可塑料铺设型式上进行改进;并结合实际运行操作,提出一系列有效的控制措施。 Combine the phenomenon about platen surface overheating in low load section of 330MW CFB of Ningdong Guohua Power Plant,the main reason is that bed temperature generates large radiation heat,but the steam flow relatively less in the load stage.It is important factor of bed temperature lose control because of equipment malfunction or improper operation adjustment.The technical improvement is mainly from improving pipe wall material and changing to layout style of refractory plastic material on Boiler Factory,and combined with the actual operation,puts forward a series of effective control measures
作者 段宝
出处 《电站系统工程》 北大核心 2012年第1期29-31,共3页 Power System Engineering
关键词 循环流化床锅炉 床温 屏式受热面 超温 原因分析 预防措施 CFB bed temperature platen surface overheating cause analysis precautionary measure
作者简介 段宝(1984-),男,学士。西安,710065
  • 相关文献

参考文献2

二级参考文献1

共引文献4

同被引文献39

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部