摘要
随着铁路建设的快步发展,既有线路的通信线路迁改割接问题非常突出,为了减少对原有通信设备的影响,以邯济线为实例,对光缆割接方案及安全措施进行探讨。
With the rapid development of railway construction,the relocation,modify,cut over issues of existing communication cables for railways become more noticeable.In order to reduce the impact on existing communication equipment,the paper takes Handan-Jinan line as an example to discuss the cutover scheme of fiber optic cables and the safety measures.
出处
《铁路通信信号工程技术》
2012年第4期85-87,共3页
Railway Signalling & Communication Engineering
关键词
光缆
割接
测试
fiber optic cable
cutover
test