基于2010年上海世博会重大配套工程——打浦路隧道复线工程,结合具体实际地质条件及施工参数,利用Abaqus有限元分析软件,建立三维非线性有限元模型,模拟泥水盾构沿弧线斜下穿已有隧道的施工过程.计算并分析在泥水盾构施工过程中,已有隧道发生的变形、产生的应力以及地表发生的沉降,预测泥水盾构施工对已有隧道和地表的影响,并与实测数据进行比较,说明分析预测的可信性.所得结果不仅对该工程具有积极的指导意义,而且对其他类似工程的分析也具有重要的借鉴作用.
This paper established a 3D nonlinear finite element model with Abaqus based on actual geological conditions and construction parameters. By simulating the construction process of slurry shield crossing beneath existing tunnel, deformation and stress of the tunnel, and the subsidence of ground in the slurry shield tunnel construction are calculated and analyzed. The impacts of slurry shield construction on the existing tunnel are predicted. Comparison with the measured data shows that the calculation is reliable. The results provide usful guidance to the project, and may by used as'a reference for analyses of similar projects.
出处
《上海大学学报(自然科学版)》
CAS
CSCD
北大核心
2012年第4期401-407,共7页
Journal of Shanghai University:Natural Science Edition
基金
上海市重点学科建设资助项目(S30106)
关键词
预测分析
泥水盾构
下穿已有隧道
非线性有限元方法
forecast analysis
slurry shield
crossing beneath existing tunnel
nonlinear finite element method
作者简介
通信作者:马永其(1966~),男,副教授,博士,研究方向为地下工程及相关力学.E-mail:mayq@staff.shu.edu.cn