期刊文献+

计及风电随机性的风-火机组组合模型研究 被引量:4

Studies on the unit commitment of wind-thermal power considering the randomness of wind power
在线阅读 下载PDF
导出
摘要 风电的随机性改变了传统的机组组合模型。为了计及风电随机性、更好地利用好风电,运用机会约束的方法考虑风电随机对机组组合的影响,提出一种可既避免模型复杂化又计及风电随机性的机组组合模型,并用随机模拟的方法来实现风电随机性的机会约束。通过算例证明模型的正确性。 The randomness of the wind power has changed the traditional unit commitment model. In order to considering the randomness of wind power and making better use of wind power, a new unit commitment of thermal-wind is proposed using chance constraint, which could not only avoid complicate the unit model, but also consider the randomness of wind power. And the stochastic simulation method is used to achieve the chance constraint of wind power. Examples have proved the correctness of the model.
作者 王和先
出处 《电子设计工程》 2012年第17期39-42,共4页 Electronic Design Engineering
关键词 风电 机组组合 机会约束 随机模拟 wind power unit commitment chance constraint stochastic simulation
作者简介 王和先(1986-),男,江苏滨海人,硕士。研究方向:电力系统机组组合,新能源发电系统控制。
  • 相关文献

参考文献17

  • 1Global wind energy Council. Global Wind Statistics 2010[EB/OL]. (2011-02-02). http://www.gwec.net/.2011.02.02.
  • 2杨秀媛,肖洋,陈树勇.风电场风速和发电功率预测研究[J].中国电机工程学报,2005,25(11):1-5. 被引量:589
  • 3Kamal L,Jafri Y Z. Time series models to simulate and forecast hourly averaged wind speed in Wuetta,Pakistan[J]. Solar Energy, 1997,61 ( 1 ) :23-32.
  • 4Maddaloni J D,Rowe A M,Kooten G C. Wind integration into various generation mixtures [J]. Renewable Energy, 2009,34 (3) :807-814.
  • 5张晓花.节能减排下风火蓄机组组合研究[D].南京:河海大学.2010.
  • 6江岳文,陈冲,温步瀛.含风电场的电力系统机组组合问题随机模拟粒子群算法[J].电工技术学报,2009,24(6):129-137. 被引量:91
  • 7Ruiz P A, Philbrick C R,Sauer P W. Wind power day-ahead uncertainty management through stochastic unit commitment Policies[C]//Power Systems Conference and Exposition,2009. PES'09. IEEE/PES 15-18,2009 : 1-9.
  • 8CHEN Chun-lung. Optimal wind-thermal generating unit commitment[J]. IEEE Transactions on Energy Conversion,2008, 23 ( 1 ) :273-280.
  • 9王彩霞,乔颖,鲁宗相,徐飞.低碳经济下风火互济系统日前发电计划模式分析[J].电力系统自动化,2011,35(22):111-117. 被引量:41
  • 10Chen W T, Li Y P,Huang G H,et al. A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty[J]. Applied Energy,2010, 87(3) : 1033-1047.

二级参考文献67

共引文献972

同被引文献94

引证文献4

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部