期刊文献+

一类三阶段供应链排序问题的近似算法 被引量:1

Approximation Algorithms for a Three-Stage Supply Chain Scheduling Problem
在线阅读 下载PDF
导出
摘要 主要研究一类三阶段供应链排序问题。储存工件的仓库和工厂在不同的地点,工件加工前需要从仓库运到工厂,加工完后再运回仓库。文中分别考虑了两个模型,第一个是两辆有容量限制的同类型车和单台机;第二个是一辆车和两台平行机。目标函数是极小化最后一个工件运回仓库的时间。针对两个模型,提出了相应的近似算法并证明其最坏情况界分别为2和2+1/2λ-1(其中λ>1)。 In this paper, we study a three-stage supply chain scheduling problem. The warehouse that stores all materials and finished jobs, as well as the machines that process the jobs are located at different places. The jobs travel between the factory and warehouse. The paper mainly considers two models: one involves two vehicles and a single machine; the other involves a vehicle and two parallel machines. The ob- jective is to minimize the makespan of the schedule, i. e. , the period within which all jobs are transported back to the warehouse after processing. For both models, we present algorithms and show that their worst-case ratios are 2 and 2+2λ-1^-1(λ〉1),respectively.
出处 《浙江理工大学学报(自然科学版)》 2012年第5期709-713,共5页 Journal of Zhejiang Sci-Tech University(Natural Sciences)
基金 国家自然科学基金项目(11001242 11071220) 浙江省自然科学基金项目(Y6090554 Y6090175 Y6110091)
关键词 供应链排序 近似算法 最坏情况界 supply chain scheduling approximation algorithm worst-case ratio
作者简介 胡觉亮(1958-),男,浙江杭州人,教授,大学本科,主要从事组合优化与教学建模的研究。
  • 相关文献

参考文献1

二级参考文献1

共引文献1

同被引文献11

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部