摘要 研究适合不同需求,尤其是适应深水环境、较大水下结构物安装方法,对于实际工程项目方案的确定和实施具有重要的参考价值。在调研大量水下生产系统开发方案和安装工程实例的基础上,归纳了管道装置的安装方法、安装装备在不同条件下,尤其是深水环境下所采用的不同方法。通过对比各种安装方法的优点和限制条件,指出了中国南海深水油气田在安装技术方面应开展的工作。 Research on the installation method suitable for different requirements, especially for deepwater environment and relatively large underwater structure serves as an important reference for determination and imple- mentation of actual engineering project scheme. On the basis of studying a large number of development schemes for underwater production system and installation engineering examples, the methods to install pipeline are summarized as well as the methods used by installing equipment in different conditions, especially in subsea environment. The work that should be done in installation technology in the South China Sea subsea oil-gas fields is clarified through comparison of the strengths and constraints of the installation methods.
出处 《石油机械》 北大核心 2012年第5期48-52,69,共6页 China Petroleum Machinery
基金 国家科技重大专项"南海深水油气开发示范工程"(2008ZX05026-005) 国家高技术研究发展计划(863计划)"深水海底管道铺设技术"(2006AA09A105)
关键词 水下生产系统 管道装置 安装技术 PLET PLEM ILS WSA underwater production system pipeline installation technology PLET PLEM ILS WSA
作者简介 李婷婷,女,生于1988年,2009年毕业于中国石油大学(北京)机械设计制造及其自动化专业,现为机械工程专业在读硕士研究生。地址:(102249)北京市昌平区。电话:(010)89736069。E—mail:Liting135798@126.com。
  • 相关文献

参考文献3

二级参考文献25

  • 1段梦兰,陈永福,李林斌,张继春,包小兵,周立伟.海洋平台结构的最新研究进展第9届ISOPE大会报告综述[J].海洋工程,2000,18(1):86-90. 被引量:9
  • 2金秋,张国忠.世界海洋油气开发现状及前景展望[J].国际石油经济,2005,13(3):43-44. 被引量:33
  • 3谢彬,张爱霞,段梦兰.中国南海深水油气田开发工程模式及平台选型[J].石油学报,2007,28(1):115-118. 被引量:93
  • 4Stephen A H,Neil Willis.Steel Catenary Risers for Deepwater Environments[C]//Hauston:Offshore Technology Conference,1998,1-7.
  • 5Hecdo D.Loading History Effects for Deep-Water S-Lay of Pipelines[J].Journal of Offshore Mechanics and Arctic Engineering,2004,26(2):156-163.
  • 6Baker B,McClure L.Reel method speeds 1ay of pipe-in-pipe[J].Offshore,2002,62(8):72,156.
  • 7Andrei Dumitrescu,Massima Pulici,Marian Trifon.Deep Water Seahnes lnstallation by Using the J-lay Method-The Blue Stream Experience[J].Thirteenth Intematlonal Offshore and Polar Engineering Conference,2003(3):38-43.
  • 8Choi H S.Deepwater pipe lay analysis[J].Journal of Offshore Technology,1999,7(2):18-20.
  • 9Borell A J,Perinet,Dominique.What future for Conventional Pipelay Barges[C]//Huston:Proceedings-Offshore Technology Conference,1997:345-351.
  • 10Stephen j Rowe, Brain Maehenzie, Richard Snell. Deepwater installation of subsea hardware[C]///Proceedings of the lOth OffshoreSympositml. 2001.

共引文献70

同被引文献39

  • 1孙成赞,王允.OFFPIPE软件在海底管道铺设中的应用[J].石油工程建设,2005,31(5):49-52. 被引量:12
  • 2李清平.我国海洋深水油气开发面临的挑战[J].中国海上油气(工程),2006,18(2):130-133. 被引量:126
  • 3International Organization for Standardiztion. 1SO 13628- 15: Petroleum and natural gas industries-design and op- eration of subsea production systems-partl5: Subsea structmes and manifolds [ S] . 2010.
  • 4Det Norske Veritas. Offshore standard DNV-OS-F101 : Submarine pipeline systems [ S] . 2010.
  • 5董楠.深水海底管道终端选型方法及优化结构设计[c]∥第十五屑中国海洋(岸)工程学术讨论会论文集(上).北京:海洋出版社,2011.
  • 6Det Norske Veritas. Recommended practice DNV-RP- C205: Environmental conditions and environmental loads [S] . 2010.
  • 7DNVOSF101-2010,海底管线系统[S].
  • 8APIRP1111--2009,海上油气管线设计、建造、操作和维护(极限状态设计)[S].
  • 9李大勇,都浩,孙宗军,等.海底裙式吸力锚:CN200920239914.8[P].2009-10-14.
  • 10宋岩新,杨庆,唐小微,万少石.ABAQUS后处理二次开发在海底管线稳定性分析中的应用[J].中国海洋平台,2008,23(4):18-22. 被引量:6

引证文献6