摘要
为使水库保持最佳的发电效益,同时又能最大限度地保留有效库容,利用多目标规划方法构建了水沙联合调度多目标规划模型,模型由水库优化调度模型及泥沙冲淤计算模型两部分组成,通过水位参数的传递实现子模型的结合,并利用改进逐步优化算法对模型进行求解。以三峡电站的实际数据为例进行了计算,结果表明模型得到的数据合理、计算速度快,为研究水库泥沙问题提供了重要依据。
In order to maintain optimal power benefit and maximum effective reservoir storage capacity, water-sedi- ment joint optimal scheduling model is established by using multi-objective programming method, which is composed of reservoir optimal scheduling model and sediment erosion calculation model. The two models are banded together though the transfer of water level parameters. Improved progressive optimality algorithm is adopted to solve the model. A practi- cal data of Sanxia hydropower station is used for the simulation. The results show that the model is reasonable and has quick computation speed, which provides basis for study on sediment problems in reservoir optimal scheduling.
出处
《水电能源科学》
北大核心
2012年第4期29-31,187,共4页
Water Resources and Power
基金
国家自然科学基金资助项目(51179069)
关键词
水库优化调度
水沙联合调度
改进POA算法
多目标决策
惩罚函数
reservoir optimal operation
water-sediment joint operation
improved progressive optimality algorithm
multi-objective decision
penalty function
作者简介
王帅(1986-),男,硕士研究生,研究方向为水库调度,E—mail:fancyws@126.com
通讯作者:彭杨(1975-),女,副教授,研究方向为水库调度,E—mail:pengyang@ncepu.edu.cn