水电工程建设具有投资大,工期长,施工工序多,相互干扰大的特点。为了在保证安全和质量的前提下,按照预定的工期完成库什塔依水电站各个节点目标,必须充分发挥业主的主导核心作用,做好各项组织和协调工作,确保工程安全、质量、进度、投资、技术和环保等处于受控状态。
The construction of hydropower project usually has characteristics of more investment, longer period, more process and more interference. In order to achieve the planned construction targets in the context of keeping construction safety and quality during the construction of Kushitayi Hydropower Station, the core leading role of Owner must be fully played to organize and coordinate the project construction, so as to keep the safety, quality, progress, investment, technology and environmental protection in a controlled status.
出处
《水力发电》
北大核心
2012年第4期51-52,共2页
Water Power
关键词
工程建设
核心作用
业主
库什塔依水电站
project construction
core leading role
owner
Kushitayi Hydropower Station
作者简介
黄书鼎(1963-),男,江苏江都人,工程师,从事水电工程建设管理工作.