摘要
以松花江大桥工程为例,针对该工程的施工监控,结合该桥所处的地理环境对寒冷地区的混凝土桥梁温度进行现场监测及试验,对寒冷地区的混凝土桥梁结构温度场及温度效应进行研究。在施工监控中采用了立模标高的相对高差形式来消除温度效应的影响。通过对监测与试验数据的分析,得出了一些有意义的结论,并介绍了消除温度对线形控制影响的有效方法。
Based on construction monitoring of the Songhua River Bridge,which is located at cold areas in China,the temperature field and temperature effects are monitored and tested.Relative height difference of formwork erection elevation is adopted to eliminate the influence of temperature effect in construction.Through the analysis of the monitoring and testing data,some significant conclusions are obtained and the effective ways to reduce the influence of temperature on linear control are introduced.
出处
《施工技术》
CAS
北大核心
2011年第10期98-101,110,共5页
Construction Technology
关键词
桥梁工程
箱梁桥
悬臂
监测
温度测量
bridges
box girder bridge
cantilever
monitoring
temperature measurement
作者简介
曹立波,中铁十二局集团第二工程有限公司工程师,山西省太原市小店区人民南路19号030032,电话:18636634657,E-mail.sdclb120@163.com