期刊文献+

浅埋深高阶段综放开采冲击地压原因分析与防治 被引量:6

Cause Analysis and Prevention on Mine Strata Pressure Bumping from Fully Mechanized Top Coal Caving Mining at Steep Inclined High Level Stage of Shallow Seam
在线阅读 下载PDF
导出
摘要 针对铁厂沟煤矿发生的开采深度仅155 m的特殊冲击地压,分析了该矿浅埋深急倾斜高阶段综放开采发生冲击地压的矿压显现情况与特点,并对影响此次冲击地压的地质因素与生产因素进行了剖析。结果表明:煤岩冲击倾向性、开采深度与地质构造、煤壁前方超大的支承压力、工作面位置及开采顺序、采煤方法、工作面推进速度、放炮等因素导致冲击地压发生。通过分析此次冲击地压发生的原因,提出了适合该矿防治冲击地压的措施。 According to the special mine strata pressure bumping occurred from Tiechanggou Mine with a mining depth of 155 m,the paper had an analysis on the mine pressure behavior conditions and features of the mine strata pressure bumping occurred from the fully mechanized top coal caving mining at the steep inclined high level section in seam with a shallow depth of the mine.Meanwhile the geological factors and production factors affected to the mine pressure bumping were analyzied.The results showed that the coal and rock bumping tendency,the mining depth and geological structure,the super support pressure in front of the coal mining face,the coal mining face location and the mining sequences,the mining method,the coal mining face advancing speed,the blasting and other factors could cause the mine pressure bumping occurred.With the analysis on the cause of the mine pressure bumping occurred,the suitable measures to prevent and control the mine strata pressure bumping in the mine were summarized.
出处 《煤炭科学技术》 CAS 北大核心 2011年第7期25-27,82,共4页 Coal Science and Technology
关键词 浅埋深 综放开采 冲击地压 防治措施 shallow depth fully mechanized top coal caving mining mine strata pressure bumping prevention and control measures
作者简介 李浩荡(1981-),男,河北邢台人,工程师,硕士,现在神华集团新疆能源有限责任公司铁厂沟煤矿挂职,从事煤炭生产技术管理工作。Tel:18910988237,E—mail:lhdceo@126.com
  • 相关文献

参考文献10

二级参考文献39

共引文献621

同被引文献42

引证文献6

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部