摘要 可中断负荷是非常重要的需求侧资源.本文对于在保证系统安全的前提下进行可中断负荷的优化调度,基于二进制粒子群优化算法(BPSO)分时段优化调度特性不同的多个可中断负荷,以满足系统各时段削减容量的需求,同时满足可中断负荷的运行约束条件,并使供电公司支付的补偿费用最小以及执行中断的次数最少.使用加权的处理方法把可中断负荷优化调度的多目标优化问题简化为单一的目标函数,经实例验证基于BPSO的优化算法对可中断负荷的优化调度是有效的. Interruptible Loads(ILs) represent highly valuable demand side resources.With regards to the scheduling of interruptible loads,this paper investigates the use of binary particle swarm optimization(BPSO) to schedule a number of ILs whose operational characteristics are different over 16 hours.The scheduling objective is to achieve the requirement of hourly curtailments while satisfying the operational constraints of the interruptible loads,minimizing the payments and the frequency of interruptions.This multi-objective optimization problem was simplified to a single objective function by weight.Simulation results are presented to validate the method.
出处 《南京师范大学学报(工程技术版)》 CAS 2011年第2期19-25,共7页 Journal of Nanjing Normal University(Engineering and Technology Edition)
关键词 可中断负荷 二进制粒子群算法(BPSO) 优化调度 需求侧管理 interruptible load binary particle swarm optimization(BPSO) optimization scheduling demand side management
作者简介 通讯联系人:赵彩虹,教授,研究方向:电力系统自动化及无功优化电力市场.E-mail:zhaocaihong@njnu.edu.cn
  • 相关文献

参考文献11

  • 1薛禹胜,徐伟,Zhaoyang DONG,万秋兰.关于广域测量系统及广域控制保护系统的评述[J].电力系统自动化,2007,31(15):1-5. 被引量:110
  • 2何禹清,彭建春,毛丽林.计及电压水平的多目标可中断负荷阻塞管理[J].电网技术,2010,34(1):122-128. 被引量:6
  • 3Majumdar S, Chattopadhyay D, Parikh J. Interruptible load management using optimal power flow analysis [ J ]. IEEE Trans Power Syst, 1996,11(2) :715-720.
  • 4Bai J, Gooi H B, Xia L M, et al. A probabilistic reserve market incorporating interruptible load [ J ]. IEEE Trans Power Syst, 2006,21 ( 3 ) : 1079-1087.
  • 5Xia L M, Gooi H B, Bai J, Probabilistic spinning reserves with interruptible loads [ C ]// Proc IEEE Power Eng Soc General Meeting. USA : Denver, 2004 : 146-152.
  • 6Huang K Y. Demand subscription services--An iterative dynamic programming for the substation suffering from capacity short- age[J]. EEE Trans Power Syst, 2003,18(2) :947-953.
  • 7Wang Jianxue, Wang Xifan, Ding Xiaoying. The forward contract model of interruptible load in power market[ C ]//IEEE PES Transmission and Distribution Conference. China: Dalian, 2005.
  • 8Huang K Y, Chin H C, Huang Y C. A model reference adaptive control strategy for interruptible load management[ J]. IEEE Trans Power Syst, 2004,19 ( 1 ) :683-689.
  • 9于娜,芙蓉薇.电力市场高峰时段可中断负荷优化购买模型[J].电力系统及其自动化学报,2010,22(4):89-93. 被引量:11
  • 10Kennedy J, Eberhart R. Particle swarm optimization [ C ]// Proc of the 1995 IEEE International Conference on Neural Net- works. Australia: IEEE Service Center, 1995:1 942-1 948.

二级参考文献78

共引文献120

同被引文献45

  • 1王建学,王锡凡,王秀丽.电力市场可中断负荷合同模型研究[J].中国电机工程学报,2005,25(9):11-16. 被引量:115
  • 2Callaway D S,Hiskens I A.Achieving controllability of electric loads[J].Proceedings of the IEEE,2011,99(1):184-199.
  • 3Callaway D S.Tapping the energy storage potential in electric loads to deliver load following and regulation with application to wind energy[J].Energy Conversion and Management,2009,50(5):1389-1400.
  • 4Battistelli C,Baringo L,Conejo A J.Optimal energy management of small electric energy systems including V2G facilities and renewable energy sources[J].Electric Power Systems Research,2012(92):50-59.
  • 5Ramteen S,Walter S.Evaluating the impacts of real-time pricing on the usage of wind generation[J].IEEE Transactions on Power Systems,2009,24(2):516-524.
  • 6Zhong H, Xie L, Xia Q.Coupon incentive-based demand response: Theory and case study[J].IEEE Transactions on Power System,2013,28(2):1266-1276.
  • 7Robič T,Filipič B.DEMO:Differential evolution for multiobjective optimization[C]//Proceedings of the 3rd International Conference on Evolutionary Multi-Criterion Optimization.Heidelberg,Springer:IEEE,2005:520-533.
  • 8Takagi M, Iwafune Y, Yamamoto H, et al. Energy storage of PV using batteries of battery-switch stations I C 1// IEEE International Symposium on Industrial Electronics. Austin : 1EEE, 2010 : 3413-3419.
  • 9Kwanea A, Thohy A, Meibom P. Demand side resource operation on the Irish power system with high wind power penetration [J].Energy Policy, 2011, 39 : 2925-2934.
  • 10Haussmann W B, Erget T, Wittwerc C. Decentralised optimization of cogeneration in virtual power plant [J].Solar Energy, 2010, 84 : 604-611.

引证文献3

二级引证文献182

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部