摘要 山西省万家寨引黄一期工程157 km隧洞,有122 km采用6台双护盾全断面掘进机施工。本文就总干线6#-7#-8#隧洞采用双护盾全断面掘进机施工中,隧洞衬砌系统设计、六边形混凝土预制管片初步设计等进行了总结分析,介绍了六边形混凝土管片的内力、应力计算方法、计算参数选取和混凝土等级和钢筋配制参数确定,对类似工程有一定借鉴作用。 The phase I of Wanjiazhai Yellow River Diversion Project in Shanxi Province includes tunnels with the total length of 157 kin; among which 122 km tunnels are excavated with six double-shield TBMs. The design of the lining system for the tunnels, preliminary design of the hexagon-precast concrete lining segment, etc. for the constructions of the No. 6, No. 7 and No. 8 tunnels of the main line of the project excavated by the double-shield TBMs are summarized and analyzed herein, and then the method for the calculation on the internal force and stress of the hexagon-precast concrete lining segment, the selection of the calculation parameters, the determination on the parameters of the concrete grade and the reinforcement arc analyzed as well. All of these can provide a certain reference for the similar project.
作者 梁晋平
出处 《水利水电技术》 CSCD 北大核心 2011年第6期15-17,共3页 Water Resources and Hydropower Engineering
关键词 双护盾全断面掘进机 六边形管片 衬砌设计 山西省万家寨引黄工程 double-shield TBM hexagon-precast lining segment design of lining Wanjiazhai Yellow River Diversion Project in Shanxi Province
作者简介 梁晋平(1960-),男,高级工程师,副总工程师,质量监督处处长。
  • 相关文献

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部