摘要
风能已成为世界上增长最快的清洁可再生能源,风力发电世界各国争相发展。然而我省风力发电项目进展较为缓慢,主要原因在于,我省公路网密度较低,许多公路等级偏低,平面线性较差,运输风电设备的长货车通行较困难。风电路的设计有一定的特殊性,我们在进行风电路设计时不能照搬规范上的数据,特殊数值需要通过计算求得,以保证风电设备的顺利运输。
Wind is the clean and renewable energy resource and wind power generation developed in all countries.The wind power generation project developed slowly in Heilongjiang province for the low road density and grade,poor plane linearity,difficult traffic for the transit truck.The design of wind power generation road has its particularity so the criterion data can not be copied in the design.The special value should be calculated to ensure the transit of the wind power generation equipment.
出处
《林业科技情报》
2011年第1期105-107,共3页
Forestry Science and Technology Information
关键词
风电路
平曲线加宽
竖曲线
风力发电
wind power generation road
plane curve widening
vertical curve
wind power generation