摘要
以江阴长江公路大桥北引桥支座更换施工方案,介绍了支座更换的施工方法,及施工过程的控制要求,并对支座的维修要点进行了探讨,可供同类型的桥梁支座更换提供参考。
Taking bearing replacement of Jiangying Yangtze River Bridge as an example,this paper introduces the construction technology of bearing replacement and control points in construction,the key points of bearing repairment are also analysed. The research results could be taken as reference to bridge bearing replacement projects.
出处
《现代交通技术》
2010年第6期62-64,75,共4页
Modern Transportation Technology
关键词
桥梁工程
支座更换
同步顶升
施工方案
bridge engineering
bearing replacement
synchronons jacking up
construciton plan