察汗乌苏水电站工程建设中的新技术应用

Application of new technologies in construction of Chahanwusu Hydropower Station
在线阅读 下载PDF
导出
摘要 察汗乌苏水电站地处偏远、现场交通不便、施工干扰大、工期紧、质量要求高。为此,参建各方在科学论证的基础上,成功引进、创新并应用了新技术、新材料、新设备、新工艺(简称"四新"技术)进行设计和施工,既保证了工程建设质量,又节省了投资,加快了进度。特别是深覆盖层建坝技术和面板坝垫层料移动边墙固坡工艺在国内外同类工程建设中很值得推广。 Chahanwusu Hydropower Station is located at remote districts with poor transport facilities and characterized by severe construction interference,tight construction period and high construction quality requirement.For these reasons,based on scientific demonstration,the designers and constructors successfully introduced new technologies,new material,new equipment and new technology(referring as 4-new technologies) in design and construction,guaranteed the construction progress,saved investment,accelerated construction.The construction technologies of dam construction in deep covered layer and slope stabilizing by cushion material moving sidewall are worth popularizing in water conservancy and hydropower station construction at home and abroad.
出处 《人民长江》 北大核心 2010年第24期63-66,共4页 Yangtze River
关键词 深厚覆盖层 移动边墙挤压 施工新技术 察汗乌苏水电站 thick overburden moving side wall extrusion new technologies in construction Chahanwusu Hydropower Station
作者简介 作者简介:柳新根,男,高级工程师,主要从事水利水电工程施工与管理工作。E—mail:liuxingen@sina.com
  • 相关文献

参考文献1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部