摘要
文中对广东省道114线K57+900~K58+040段高填边坡的塌方治理,采用钢管桩与钢筋混凝土挡土墙支护、坡面挂网抹混凝土的措施进行了阐述。实践证明,处理效果明显,达到了预期目标。
This paper describes the measures of steel pipe pile and reinforced concrete retaining wall supporting,wire netting sprayed concrete on slope face to deal with high-filled slope collapse in K57 + 900~K58 + 040 section of Guangdong Provincial Highway No.114 Line.It is proven from practice that such treatment measures have achieved obvious effect,achieving the expected objective.
出处
《路基工程》
2010年第5期175-176,共2页
Subgrade Engineering
关键词
高填方边坡
钢管桩
钢筋混凝土挡墙
治理
high-filled slope
steel pipe pile
reinforced concrete retaining wall
treatment