期刊文献+

多品种小批量环境下的印刷电路板组装切换次数优化 被引量:11

Optimization on setups for the printed circuit board assembly in a multi-type and low-volume environment
在线阅读 下载PDF
导出
摘要 以典型的高速贴片机为研究对象,探讨了多品种小批量生产环境下印刷电路板的组装调度优化问题。以切换次数与切换时间最小化为目标建立了混合整数规划模型,提出了一种基于相对相似系数的成组策略,并开发了基于主动禁忌搜索的改进成组切换算法,通过权衡组与组之间以及各组内的切换次数实现总切换时间最小化。基于国外同类研究的仿真实验,验证了所提策略及算法的有效性。 Taking typical high-speed surface mounting technology assembly machine as research object,the Printed Circuit Board (PCB) assembly scheduling optimization problem in a multi-type and low-volume environment was studied. A mixed integer programming model was constructed to minimize the setups and setup time at first,then a grouping strategy based on both relative similitude coefficient was proposed and an improved grouping setup algorithm based on reactive tabu search was developed.It tried to achieve an optimal changeover schedule by balancing the setup times between different PCB groups and PCBs within each group. The simulation tests,coming from the literature,showed the effectiveness of the proposed strategy and algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第9期1928-1934,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70572086) 辽宁省自然科学基金资助项目(20052140)~~
关键词 印刷电路板 表面贴装技术 成组算法 切换策略 相对相似系数 禁忌搜索 printed circuit board surface mounting technology grouping algorithm setup strategy relative similitude coefficient tabu search
作者简介 靳志宏(1963-),男,辽宁沈阳人,教授,博十生导师,博士,研究方向:物流系统优化、生产与运作管理等,E—mail:jinzhihong@dlmu.edu.cn。 刘颖(1979-),女,内蒙古赤峰人,博士研究生,研究方向:物流系统优化等; 陈贞(1984-),女,山东烟台人,讲师,研究方向:生产与运作管理等; 李向军(1963-),女,辽宁沈阳人,副教授,研究方向:自适应控制以及模糊控制等。
  • 相关文献

参考文献12

  • 1LEON V J,PETERS B A.A comparison of setup strategies for printed circuit board assembly[J].Computers & Industrial Engineering,1998,34(1):219-234.
  • 2BHASKAR G,NARENDRAN T T.Grouping PCBs for setup reduction:a maximum spanning tree approach[J].International Journal of Production Research,1996,34(3):621-632.
  • 3ROSSETTI M D.STANFORD K J A.Group sequencing a PCB assembly system via an expected sequence dependent setup heuristic[J].Computers and Industrial Engineering,2003,45(1):231-254.
  • 4LEON V J,JEONG I J.An improved group setup strategy for PCB assembly[C] //Proceedings of the ICCSA 2005.Berlin,Germany:Springer-Verlag,2005:312-321.
  • 5OHNO K,JIN Z H,ELMGHRABY S S.An optimal assembly mode of multi-type printed circuit board assembly[J].International Journal of Computer & Industrial Engineering,1999,50(4):451-471.
  • 6靳志宏,计明军,刘颖.印刷电路板大型并行系统的表面贴装调度优化及其实证研究[J].中国机械工程,2009(9):1067-1070. 被引量:4
  • 7郭姝娟,靳志宏.表面组装技术生产线贴片机负荷均衡优化[J].计算机集成制造系统,2009,15(4):817-822. 被引量:11
  • 8QUINTANA R,LEON V J.An improved group setup management strategy for pick and place SMD assembly[R].College Station,Tex.,USA:Texas A&M University,1997.
  • 9MAIMON O,SHTUB A.Grouping methods for printed circuit boards[J].International Journal of Product Research,1991,29(7):1370-1390.
  • 10HASHIBA S,CHANG T C.Heuristic and simulated annealing approaches to PCB assembly setup reduction[M] //Human Aspects in Computer Integrated Manufacturing.Amsterdam,the Netherlands:Elsevier,1992:769-777.

二级参考文献14

  • 1靳志宏,关志民,马钦海.集成电路板组装系统优化问题及其研究动态[J].中国管理科学,2004,12(z1):63-66. 被引量:3
  • 2鲜飞.SMT生产线负荷分配及平衡研究[J].印制电路信息,2004,12(6):63-65. 被引量:19
  • 3曾又姣,马登哲,金烨,严隽琪.Hierarchical planning for a surface mounting machine placement[J].Journal of Zhejiang University Science,2004,5(11):1449-1455. 被引量:4
  • 4鲜飞.高速贴片机优化软件的设计与开发[J].印制电路信息,2003,11(11):56-58. 被引量:13
  • 5JIN Z H, OHNO K, ITO T, et al. Scheduling hybrid flowshops in printed circuit board assembly lines[J]. International Journal of Production and Operation Management, 2002,11(2):216-230.
  • 6OHNO K, JIN Zhihong, ELMGHRABY S E. An optimal assembly mode of multi-type printed circuit boards[J]. International Journal of Computer & Industrial Engineering, 1999, 36 (2): 451-471.
  • 7OHNO K, JIN Z, NOMURA H, OISHI K. Optimization of reel positioning and insertion sequencing in multi-type printed circuit board assembly[J]. Journal of Japan Industrial Management Association, 1999,50(4) : 198-206
  • 8KULAK O, YILMAZ I O, GUNTHER H O. A GA-based solution approach for balancing printed circuit board assembly lines[J]. OR Spectrum, 2008,30 (3) : 469-491.
  • 9AMMONS J C, CARLYLE M, CRANMER L,et al. Component allocation to balance workload in printed circuit card assembly systems[J]. IIE Transactions, 1997,29 (4) : 265-275.
  • 10冯志刚.SMT生产线的优化[J].电子工艺技术,2000,21(1):24-26. 被引量:12

共引文献10

同被引文献62

  • 1陈荣军,唐国春.同类机的供应链排序[J].系统工程学报,2010,25(1):62-67. 被引量:14
  • 2靳志宏.印刷电路板组装生产线调度优化问题建模[J].中国管理科学,2008,16(S1):122-127. 被引量:3
  • 3鲜飞.高速贴片机优化软件的设计与开发[J].印制电路信息,2003,11(11):56-58. 被引量:13
  • 4蒋美仙,金寿松,冯定忠,鲁建厦.我国机械制造企业的单件流应用研究[J].工业工程与管理,2006,11(5):107-111. 被引量:8
  • 5JIN Z H, OHNO K, ITO T, et al. Scheduling hybrid {low shops in printed circuit board assembly lines [J]. Interna tional Journal of Production and Operation Management 2002, 11(2): 216-230.
  • 6OHNO K, JIN Z H, ELMGHRABY S S. An optimal as- sembly mode of multi-type printed circuit board assembly [J]. International Journal of Computer & Industrial Engi- neering, 1999, 50(4): 451- 471.
  • 7KULAK O, YILMAZ I O, GUNTHER H O. A GA- based solution approach for balancing printed circuit board assembly lines [J]. OR Spectrum, 2008, 30(3): 469- 491.
  • 8LOGENDRAN R, GELGGULLARI C A, SRISKAN- DARAJAH C. Minimizing the mean flow time in a two- machine group-scheduling problem with carryover se- quence dependency [J]. Robotics and Computer Integrat- ed Manufacturing, 2003(19) : 21 - 33.
  • 9门田安弘.新丰田生产方式[M].保定:河北大学出版社,2008:21-37,72-84,276-336.
  • 10EDGARTF,BUTLERSW,CAMPBELLWJ,etal.Automatic control in microelectronics manufacturing:practices,challenges and possibilities[J].Automatica,2000,36 (11):1567-1603.

引证文献11

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部