滨海核电厂的建设场地通常需进行开挖山体、填海造陆。通过对海底淤泥处理、场地推填、夯实、局部特殊区域处理的介绍,结合宁德核电厂的具体应用实例对适用于滨海核电厂的地基处理方案进行了总结,为同类工程提供借鉴。
The construction ground for nuclear power plant on coastal region are usually formed by excavating hill and filling offshore. Through introduction of the treatment of seabed mud, offshore filling, compaction,and treatment in special area. Combined with the application cases of Ningde Nuclear Power Plant, the common ground treatment applied to coastal nuclear powerplant are summarized. The results can be used as reference for other similar projects.
出处
《工程建设与设计》
2010年第9期99-102,共4页
Construction & Design for Engineering
关键词
滨海核电
开山填海
地基处理
coastal nuclear power plant
excavating hill and filling offshore
ground treatment
作者简介
罗朝专(1978-),男,福建尤溪人,工程师,从事核电工程设计工作,(电子信箱)luochaozhuan@cgnpc.com.cn。