1LINEAR.NONLINEAR AND CLASSICAL CONTROL OF A1/5TH SCALE AUTOMATED EXCAVATOR E.Sidiropoulou_,E.M.Shaban_,C.J.Taylor_,W.Tych?,A.Chotai?_ Engineering Department,Lancaster University,Lancaster,UK,c.taylor@lancaster.ac.ukEnvironmental Science Department,Lancaster University,Lancaster,UK.
2MULTI-ARM MECHANISM DESIGN MINIMIZING HINGE REACTIONS BETWEEN ARMS W.GUTKOWSKI,.J.BAUER and Z.IWANOW Institute of Fundamental Technological Research,Polish Academy of Sciences,Swietokrzyska 21,00-049 Warsaw.Poland J.PUTRESZA WS Atkins-Polska,Marszatkowska 82.00-517 Warsaw,Poland.
3阎书文.机械式挖掘机设计[M].机械工业出版社,1982.
4王超,王金.机械可靠性理论[M].北京:冶金工业出版社,1992.
5Zhou.C-L.Blind equalization and Parameters estimation ofnonminimum.