期刊文献+

随机缺陷率和中断条件下的库存策略

Inventory policy under random defective rate & disruption
在线阅读 下载PDF
导出
摘要 在假设零售商供应和中断的持续时间分别服从独立指数分布的条件下,针对订货中存在随机数量的缺陷品问题,确定了合格品和缺陷品循环的期望时间和费用,并根据更新报酬定理构建了单位时间长程平均总费用模型,从而得到零售商最优订货量及缺陷品处理的最佳批次。仿真结果表明,零售商中断强度变化不影响缺陷品处理的最佳批次;中断强度与缺陷率对订货量的影响呈相反效应;中断强度较大时,订货策略仅考虑缺陷率会带来比经济订货批量更大的费用。 Under the assumption that the durations of the supply or disruption periods at the retailer were mutually independent exponential distributions,firstly the expected cycle time and cost of both the qualified items and the defective ones were determined due to each order containing a random fraction of defective items.Secondly the long-run average cost model was established based on renewal reward theorems,so that the optimal order quantity at the retailer and the optimal number of batches for processing defective items were obtained.Finally computational results showed that the disruption intensity had no influence on the optimal number of batches and had reverse effect with the defective rate on the optimal order quantity;the average cost for the optimal order quantity only considering the defective rate was greater than that for economic order quantity when the disruption intensity was much higher.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第5期1082-1087,共6页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(50175064)~~
关键词 库存策略 缺陷率 零售商中断 订货模型 更新报酬 建模 仿真 inventory policy defective rate retailer disruption order model renewal reward modeling simulation
作者简介 娄山佐(1964-),男,山东菜州人,山东大学现代物流研究中心副教授,工学博士,主要从事物流网络复杂特性分析、库存控制、智能算法等的研究。E—mail:Lshanzuo@163.com。
  • 相关文献

参考文献12

  • 1SALAMEH M K,JABER M Y.Economic production quantity model for items with imperfect quality[J].International Journal of Production Economic,2000,64(1):59-64.
  • 2PAPACHRISTOS S,KONSTANTARAS I.Economic ordering quantity models for items with imperfect quality[J].International Journal of Production Economic,2006,100(1):148-154.
  • 3MADDAH B,JABERB M Y.Economic order quantity for items with imperfect quality:revisited[J].International Journal of Production Economic,2008,112(2):808-815.
  • 4胡劲松,郭彩云.含缺货且缺陷产品可修复的模糊生产库存模型[J].计算机集成制造系统,2009,15(5):932-938. 被引量:11
  • 5PARLAR M.Continuous-review inventory problem with random supply interruptions[J].European Journal of Operational Research,1997,99(2):366-385.
  • 6ANTONIO A R,GREGORY A D.Inventory management under random supply disruptions and partial backorders[J].Naval Research Logistics,1998,45(7):687-703.
  • 7MOHEBBI E,HAO D.An inventory model with non-resuming randomly interruptible lead time[J].International Journal of Production Economics,2008,114(2):755-768.
  • 8MOHEBBE E,HAO D.When supplier's availability affects the replenishment lead time-an extension of the supply interruption problem[J].European Journal of Operational Research,2006,175(2):992-1008.
  • 9LI Zhaolin,XU S H,HAYYA J.A periodic-review inventory system with supply interruptions[J].Probability in the Engineering and Informational Sciences,2004,18(1):33-53.
  • 10ANDREW M R,YING R,SNYDER L V.Supply disruptions with time-dependent parameters[J].Computers and Operations Research,2008,35(11):3504-3529.

二级参考文献15

  • 1周威,金以慧.具有模糊缺陷率和订货费用的库存管理研究[J].计算机集成制造系统,2006,12(5):765-771. 被引量:20
  • 2HAYEK P A,SALAMEH M K.Production lot sizing with the reworking of imperfect quality items produced[J].Production Planning and Control,2001,12(6):584-590.
  • 3CHIU Y P.Determining the optimal lot size for the finite production model with random defective rate,the rework process,and backlogging[J],Engineering Optimization,2003,35(4):427-437.
  • 4JAMAL A M M,SARKER B R,MONDAL S.Optimal manufacturing batch size with rework process at a single-stage produetion system[J].Computers & Industrial Engineering,2004,47(1):77-89.
  • 5SARKER B R,JAMAL A M M,MONDAL S.Optimal batch sizing in a multi-stage production system with rework consideration[J].European Journal of OperationalResearch,2008,184(3):915-929.
  • 6CHIU S W,CHlU Y S P.Mathematical modelling for production system with backlogging and failure in repair[J].Journal of Scientific and Industrial Research,2006,65(6):499-506.
  • 7CHANG H C.An application of fuzzy sets theory to the EOQ model with imperfect quality items[J].Computers & Operations Research,2004,31(12):2079-2092.
  • 8GRUBBSTROM R W,ERDEM A.The EOQ with backlogging derived without derivatives[J].International Journal of Production Economics,1999,59(1):529-530.
  • 9CARDENAS-BARRON L E.The economic production quantity(EPQ)with shortage derived algebraically[J].International Journal of Production Economics,2001,70(3):289-292.
  • 10CHIU S W.Production lot size problem with failure in repair and backlogging derived without derivatives[J].European Journal of Operational Research,2008,188(2):610-615.

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部