提前期与订货成本可控的集成库存模型

Integrated Inventory Model Involving Controllable Lead Time and Ordering Cost Reduction
在线阅读 下载PDF
导出
摘要 在提前期可控、订购成本可减的情况下,研究了有顾客流失的单买方和单卖方联合期望总成本最小化问题。将订购批量、单位订购成本、安全系数、提前期和运送批次作为决策变量,在提前期需求服从正态分布和分布形式未知的情况下各建立了一套库存决策模型和求解算法,并与Liao等模型的求解结果进行了比较。 The minimum problem of the single-vendor single-buyer’s total expected cost involving controllable lead time,ordering cost reduction and lost sale was considered. By taking order quantity,ordering cost,safety factor,lead time and number of lots as decisional variants,the paper presented a set of inventory decision models and algorithms in the normal distribution demand and the distribution-free cases respectively and compared its solutions with Ouyang et al (2004) inventory models with a numerical example.
出处 《科学技术与工程》 2010年第16期3901-3906,3917,共7页 Science Technology and Engineering
基金 国家自然科学基金重点项目(70732003) 国家自然科学基金项目(70572103)资助
关键词 集成库存模型 提前期可控 订购成本可减 分布自由 integrated inventory model controllable lead time ordering cost reduction distribution free
  • 相关文献

参考文献12

  • 1Goyal S K.An integrated inventory model for a single supplier-single customer problem.International Journal of Production Research,1976; 15:107-111.
  • 2Banerjee A.A joint economic lot size model for purchaser and vendor.Decision Sciences,1986:17:292-311.
  • 3Goyal S K,Gupta Y P.Integrated inventory models:the buyer-vendor coordination.European Journal of Operational Research,1989; 41:261-269.
  • 4Hill R M.The optimal production and shipment policy for a single-vendor single-buyer integrated production-inventory problem.International Journal of Production Research,1999; 37:2463-2475.
  • 5Liao C J,Shyu C H.An analytical determination of lead time with normal demand.International Journal of Operations & Production Management,1991; 11:72-78.
  • 6Ouyang L Y,Wu K S,Ho C H.Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time.International Journal of Production Economics,2004; 92:255-266.
  • 7Chang H C,Ouyang L Y,Wu K S,et al.Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction.European Journal of Operational Research,2006; 170:481-495.
  • 8Hoque M A,Goyal S K.A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer.International Journal of Production Economics,2006; 102(2):217-225.
  • 9Porteus E L.Investing in reduced setups in the EOQ model.Management Science,1985; 31:998-1010.
  • 10Scarf H.A min-max solution of an inventory problem.In:Arrow K J,Karlin S,Scarf H,Editors,Studies in the Mathematical Theory of Inventory and Production,Stanford University Press,1958:201-209.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部