水库群洪灾风险的综合评价及加固决策研究

Integrated Risk Evaluation of Flood Disasters and Strengthening Decision-making Research for Group of Reservoirs
在线阅读 下载PDF
导出
摘要 以长台溪流域10座小Ⅱ型以上水库的安全认定和社会经济调查为基础,通过单坝失事风险分析、失事后果评估计算,进行单坝的洪灾风险评价;进而从流域整体的角度,考虑库间影响,洪灾风险的传递、积聚效应,量化分析全流域各水库的洪灾综合风险。在此基础上,进行系统内各座水坝洪灾综合风险的大小排序,转化为除险加固的优先次序,为后续加固决策提供参考。 Based on the results of safety identifications and socioeconomic investigations for 10 tiny reservoirs in Changtai River Basin, East China, their respective risk analysis, wreck consequence assessment, and flood disaster risk estimation was performed. Furthermore, the group of reservoirs was abstracted into a directional system, which the transmission, diversion, and accumulation effect of flood disaster risk, even the system's reaction to one or more dam-failure events could be meditated. When the interaction of reservoirs is considered, the group of reservoirs' integrated risks evaluation model will finally be established. And then according to the model, every few dams' strengthening priority level in the system can be collated, which can be looked upon as foundation of strengthening decision.
出处 《中国农村水利水电》 北大核心 2010年第3期25-28,共4页 China Rural Water and Hydropower
基金 浙江省自然科学基金资助项目(Y507710)
关键词 水库群 洪灾风险 风险评价 加固决策 river basin group of reservoirs flood disaster risk evaluation strengthening decision
作者简介 陈斌(1974-),男,博士,副教授,主要从事水灾害防治技术研究。
  • 相关文献

参考文献5

二级参考文献17

  • 1傅琼华,苏立群.水库安全风险排序[J].水利建设与管理,2004,24(4):46-48. 被引量:1
  • 2李丽英,杨鹏.熵权系数法在煤炭企业综合效益评价中的应用[J].北京科技大学学报,2005,27(3):347-350. 被引量:16
  • 3赵冬梅,苏红顺,吴敬,马建峰.基于熵理论的无线网络安全的模糊风险评估[J].计算机应用与软件,2006,23(8):24-26. 被引量:19
  • 4World Commission on Dams(WCD). Experience with dams in water and energy resource development in the People's Republic of China[R]. 2000.
  • 5李安贵,张志宏,盂艳,等.模糊数学及其应用[M].武汉:冶金工业出版社,2003:144-146.
  • 6[2]富曾慈,王仁钟,李雷,赵广和.病险水库判别标准体系研究[R].南京:南京水利科学研究院,2004.
  • 7[3]王仁钟,李雷,王昭升,彭雪辉.基于风险评价的病险水库除险加固排序实用方法研究[R].南京:南京水利科学研究院,2004.
  • 8[4]Dekay M L,McClelland G H.Predicting loss of life in case of dam failure and flash flood[J].Risk Analysis,1993,(2).
  • 9Australian National Committee on Large Dams(ANCOLD).Guidelines on Risk Assessment[S].2003.
  • 10USBR.Dam Safety Risk Analysis Methodology[R].Denver: Technical Service Center,1999.

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部