大型水电站施工过程物资管控与核销探讨 被引量:8

Discussion on material management and cancellation-after-verification during construction of large-scale hydropower stations
在线阅读 下载PDF
导出
摘要 为了减少大型水电站施工过程中物资材料的非正常消耗,提高物资管理水平,提出落实和加强物资管控和核销工作。介绍了施工过程中物资核销的内容和应采取的方法。同时指出应从各个方面加强物资核销中的过程控制工作,使核销工作能够切实地保证施工质量和进度,降低工程成本并防止风险。 In order to decrease the abnormal consumption of materials during the construction of large-scale hydropower station and upgrading the management level,we propose implementing and strengthening material management and cancellation-after-verification,and present the contents and methods of material cancellation-after-verification.At the same time,the process control of cancellation-after-verification shall be enhanced in every aspect,so as to ensure the construction progress and quality,and reduce engineering cost and control the related risks.
出处 《人民长江》 北大核心 2010年第5期71-73,共3页 Yangtze River
关键词 施工过程 物资管控 核销 大型水电站 construction process material management cancellation-after-verification large-scale hydropower station
作者简介 作者简介:侯彦呜,男,工程师,从事水利水电施工管理工作。
  • 相关文献

同被引文献27

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部