郑新黄河大桥主桥钢桁梁跨河架设方案研究 被引量:1

Research of Erection Schemes for Steel Truss Girders of Main Bridge of Zhengzhou-Xinxiang Yellow River Bridge
在线阅读 下载PDF
导出
摘要 郑新黄河大桥主桥第一联,为跨越黄河天险而设计成六塔单索面部分斜拉连续钢桁结合梁。本桥可采用跨线龙门吊机悬臂架设方案,亦可采用回转架梁吊机悬臂架设方案,也可采用整体顶推架设方案。就三种架设方案进行了详细的比选,最终优选出多点同步连续顶推方案为本桥的架设方案。 The first unit of Zhengzhou Yellow River rail-cum-road bridge is a six pylon and single cable plane cable-stayed continuous steel truss girder bridge. The schemes for the erection include cantilever erection with gantry crane or girder erection crane, and pushing for installation. Through comparison and research of different erection schemes, it is determined that the first unit of the girder is to be erected by the multi-point longitudinal hauling scheme.
作者 孟庆贺
出处 《石家庄铁道学院学报(自然科学版)》 2009年第4期56-58,62,共4页 Journal of Shijiazhuang Railway Institute
关键词 公铁两用桥 钢桁梁 悬臂架设 顶推架设 rail-cum-road bridge steel truss girder cantilever erection pushing for installation
作者简介 孟庆贺 男 1963年出生 高级工程师
  • 相关文献

参考文献3

  • 1中铁三局集团有限公司.TB10203-2002铁路桥涵施工规范[s].北京:中国铁道出版社,2002.
  • 2中华人民共和国建设部.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003.
  • 3铁道部大桥工程局勘测设计院.TB10002.2-2005铁路桥梁钢结构设计规范[S].北京:中国铁道出版社,2005.

共引文献292

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部