摘要
研究了灌注桩后压浆技术的承载机理,分析了灌注桩后压浆技术失效案例,归纳了失效原因,以积累灌注桩后压浆施工经验,有效提高灌注桩单桩极限承载力,从而提高技术和经济效益。
It studies the loading scheme of the bored pile post grouting technology, analyzes the bored pile post grouting technology failure case, concludes the failure causes, so as to accumulate bored pile pest grouting construction experiences, effectively improve the single pile limit loading performance of the bored pile, thus improving technology and economical benefit.
出处
《山西建筑》
2009年第32期101-102,共2页
Shanxi Architecture
关键词
灌注桩
后压浆
失效
极限承载力
bored pile, post grouting, failure, limit loading performance