尼亚加拉抽水蓄能电站坝后地面塌陷机制及其对大坝安全的影响

MECHANISM OF THE PGS SINKHOLES AND THEIR EFFECTS ON THE DYKE
在线阅读 下载PDF
导出
摘要 加拿大尼亚加拉抽水蓄能电站建成于1957年。自1987年以来,在大坝桩号CH46+50附近,先后多次在坝后发生地表塌陷,成为对电站安全评估的关键性问题。该文从水文地质条件分析出发,依据坝后地下水动态监测资料,阐述了地表塌陷的成因机制及其可能的发展趋势。 The Canada Niagara River pumping generating station (PGS) was placed in service in 1957. Since 1987, a series of sinkholes have been detected along the ditch around chainage 46+50. It is necessary to make sure whether or not the sinkholes affect the safety of the dyke. Based on the analyses of hydrological conditions and piezometer response patterns around the reservoir, the mechanism of the sinkholes and the tendency of their development are involved in the paper.
作者 尚岳全
出处 《成都理工学院学报》 CSCD 1998年第3期405-410,共6页 Journal of Chengdu University of Technology
关键词 抽水蓄能电站 大坝安全 地面塌陷 尼亚加拉电站 Niagara river pumped generating station dam safety sinkhile
  • 相关文献

参考文献1

  • 1Huang J H S,Ontario Hydro Design and Development Division Report No85403,1985年

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部