摘要
对垃圾体的沉降机理进行分析,结合竖向堆高设计的无锡市桃花山垃圾填埋场扩建工程设计实例,介绍了对该工程基础即原工程垃圾体的沉降量计算和基础沉降危害的处理方法。
Based on the analysis of garbage settlement mechanism and according to the vertical pile design example of enlargement project in Taohuashan landfill in Wuxi, it was introduced the computation of project foundation, namely the garbage subsidence quantity of the original project and the measures for treating foundation settlement harm.
出处
《环境工程》
CAS
CSCD
北大核心
2009年第4期101-104,共4页
Environmental Engineering
关键词
垃圾填埋场
竖向堆高
沉降
处理方法
refuse landfill
vertical pile
settlement
treatment method