多种费用下具有时间转换约束的工期费用均衡项目调度研究 被引量:4

Duration/Cost Trade-offs in Project Scheduling with Time-Switch Constraints under Multi-Cost
在线阅读 下载PDF
导出
摘要 传统离散时间—费用均衡项目调度问题DTCTP未考虑各个活动执行时间差别,本文将时间转换约束引入传统DTCTP,同时考虑项目间接费用和联系合同双方的奖惩费用,形成多种费用条件下具有活动类型时间转换约束的工期—费用均衡项目调度模型DTCTPTSC,并对模型进行优化分析。实例结果表明,间接费用率对工期—费用决策产生影响的阈值减小,业主设置的奖惩因子对承包商的激励约束效果具有区间响应特点;进一步从业主和承包商双方角度探讨了奖惩因子的取值对各自行为的影响,分析结果对双方在项目谈判过程中具有借鉴意义。 The discrete time-cost trade-offs problems (DTCTP, for short) hardly pay attention to the differences in executing-time for all activities. In this paper, the time-switch constraints (TSC, for short) are introduced into the traditional DTCTP, and the indirect cost and the penalty/bonus cost are considered, thus we investigate the multi-cost discrete time-cost trade-offs problems with time-switch constraints of the special activity types ( DTCTPTSC, for short). The results are mostly different from the traditional DTCTP because of the TSC, that is to say, the critical value of indirect cost, which starts playing a role in the trade-offs deciding between durationcost, becomes much less than that in DTCTP. The effect of penalty/bonus intensity for contractors is divided into the different ranges. Moreover, from the contractor' s and the client' s respective viewpoints, we find that the penalty/bonus factor has the effects on both deciding behaviors, and the obtained conclusions provide some instructions for them during the project's negotiation.
出处 《运筹与管理》 CSCD 北大核心 2009年第3期78-84,共7页 Operations Research and Management Science
基金 国家自然科学基金(青年基金项目)资助项目(70702026)
关键词 运筹学 项目调度 工期-费用均衡 时间转换约束 多种费用 operational research project scheduling time-switch constraints multi-cost
作者简介 张静文(1976-),女,讲师,博士,研究方向为项目管理的理论与方法; 徐渝(1946-),女,教授,博士生导师,陕西省运筹学会理事长,主要研究方向为运筹及优化理论、项目管理、现代物流与供应链管理。
  • 相关文献

参考文献11

  • 1Erenguc S S, Tufekci S, Zappe C J. Solving time/cost trade-off problem with discounted cash flows using generalized benders decomposition[ J]. Naval Research Logistics, 1993, 40( 1 ) : 25-50.
  • 2De P, Dunne E J, Ghosh J B, Wells C E. The discrete time/cost trade-off problem revisited[ J]. European Journal of Operational Research, 1995, 81 (2): 225-238.
  • 3张静文,徐渝,何正文,柴国荣.项目调度中的时间-费用权衡问题研究综述[J].管理工程学报,2007,21(1):92-97. 被引量:24
  • 4Vanhoucke M. New computational results for the discrete time/cost trade-offs in project scheduling with time-switch constraints [ J]. European Journal of Operational Research, 2005, 165 (2) : 359-374.
  • 5Chen Y L, Rinks D, Tang K. Critical path in an activity network with time constraints[J]. European Journal of Operational Research, 1997, 100( 1 ) : 122-133.
  • 6Yang H H, Chen Y L. Finding the critical path in an activity network with time-switch constraints[ J]. European Journal of Operational Research, 2000, 120 ( 3 ) : 603- 613.
  • 7Prabuddha D, James D, Jay B G, Charles E W. Complexity of the discrete time-cost tradeoff problem for project networks[ J]. Operations Research, 1997, 45 (2) : 302-306.
  • 8Alcaraz J, Maroto C, Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [ J ]. Jouranl of Operational Research Society, 2003, 54 (3) : 614- 626.
  • 9Jozefowska J, Mika M, Rozycki R, Waligora G, Weglarz J. Simulated annealing for multi-mode resource-constrained project scheduling problem[ J]. Annals of Operations Research, 2001, 102(1-4) : 137-155.
  • 10Hartmann S. Project scheduling with multiple modes: a genetic algorithm[ J]. Annals of Operations Research, 2001, 102 (1- 4) : 111-135.

二级参考文献52

  • 1张静文,徐渝.具有时间转换约束的项目网络分析方法研究[J].系统工程理论与实践,2005,25(7):26-34. 被引量:5
  • 2陈建华,林鸣,马士华.基于过程管理的工程项目多目标综合动态调控机理模型[J].中国管理科学,2005,13(5):93-99. 被引量:31
  • 3Erenguc SS,Tufekci S,Zappe CJ.Solving time/cost trade-off problem with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993,40(1):25-50.
  • 4De P,Dunne EJ,Ghosh JB and Wells CE.The discrete time/cost trade-off problem revisited[J].European Journal of Operational Research,1995,81(2):225 -238.
  • 5Vanhoucke M.New computational results for the discrete time/cost trade-offs in project scheduling with timeswitch constraints[J].European Journal of Opcrational Research,2005,165(2):359-374.
  • 6Sou-sen Leu,An-ting Chen,Chung-huei Yang.A GAbased fuzzy optimal model for construction time-cost tradeoff[J].International Journal of Project management,2001,19(1):47-58.
  • 7Chen YL,Rinks D,Tang K.Critical path in an activity network with time constraints[J].European Journal of Operational Research,1997,100(1):122-133.
  • 8Yang HH,Chen YL.Finding the critical path in an activity network with time-switch constraints[J].European Journal of Operational Research,2000,120(3):603-613.
  • 9Prabuddha D,James D,Jay BG and Charles EW.Complexity of the discrete time-cost tradeoff problem for project networks[J].Operations Research,1997,45 (2):302-306.
  • 10Alcaraz J,Maroto C,Ruiz R.Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms[J].Jouranl of Operational Research Society,2003,54(3):614-626.

共引文献27

同被引文献54

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部