摘要根据国内外有关文献资料,探讨张力腿平台若干术语的定名问题,给出这些术语的译名和释义。This paper probes into the naming of several terms from TLP,and gives them their translation and explanation, based on the literature at home and abroad.
2[1]P F Stock,R Jarnine,W Mcintosh.Foundation monitoring on he Hutton Tension Leg Platform[A].Proc.Int.Conf.on Offshore Site Investigation and Foundation Behavior[C].1993,128:469-491.
3[2]A F Hunter,R A Zimmer,W J.Designing the TLWP[A].Offshore Technology Conference[C].1990,6360.
4[3]Store O J,et al.New foundation systems for the snorre development[Z].OTC,6882,1992,75-83.
5[4]W E Schott,G Rodenbusch.Global design and analysis of the Auger Tension Leg Platform[A].Offshore Technology Conference[C].1994,7672.
6[5]F R Botros,T J Wilson,C M Johnson.The Heidrun field:global structural design and analysis of the Heidrun TLP[A].Offshore Technology Conference[C].1996,8099.
7[6]D C Godfrey,J P Haney,A E Pippin,et al.The Mars project overview[Z].OTC 8368 presented at the 1997,OTC,Houson:i19-139.
8[7]Kris A Digre,Robert M,Kipp Rupert J.Hull.Urse TLP,Tendon & Foundation Design,Fabrication,Transportation and TLP Installtion[Z].OTC 10756 presented at the 1999,OTC,Houson:187-195.
9[8]Sephen E Kibbee,Steven J Leverette,Kent B Davies,et al.Morpeth Seastrar:Foundation and Tendon System[Z].OTC 10855 presented at the 1999 OTC,Houson:511-517.
10[9]S Fines,O J Steove,F Guidberg.Snorre TLP Tethers and foundation[Z].OTC 6623 presented at the 1991 OTC,Houson:587-593.