目前软基处理方法多种多样,各有自己的优缺点及适应条件,运用得当,既安全、快速又经济,运用不当,损失不可估量;机场软基处理根据各主体工程的工程特点、场地条件、建筑材料资源条件,采用各自相适应的不同软基处理方法,取得了很好的经济效益。本文基于机场一期工程软基处理的研究,对二期工程软基处理方法作些展望。
ow there are various methods for soft soil soundation srocessing, each of them has its advantages and disadvantages. If one method is used properly, it is safe, fast, and economic; otherwise, it may cause inestimable lose. Soft soil foundation processing for the airport projects is usually based on the engineering characteristics, construction site conditions, and building material resource for each main part of project. The purpose of this paper is to research the soft soil foundation processing of the Shenzhen Airport Project Phase 1 and to look ahead the soft soil foundation processing in the Shenzhen Airport Project Phase 2.
出处
《工程地质学报》
CSCD
1998年第2期186-192,共7页
Journal of Engineering Geology
关键词
深圳机场
工程地质条件
软土地基处理
飞机场
Soft soil foundation processing, Shenzhen Airport, Engineering geological conditions.