摘要
按矿井建设、生产进展阶段和各阶段需要查明的地质异常体的规模和精度,将高产高效矿井地质保障系统划分为4个子系统,即建井采区设计精细勘探子系统、采区(盘区)内勘探子系统、综采工作面内探查子系统和巷道掘进前方与侧帮探查子系统以及完成各子系统探测任务相应的配套技术方法组合;认为将高产高效矿井综采工作面采前勘探以行业法规或规程加以规范是必要的。
According to the stages in mine construction and production progress,as well as the scale and accuracy of geological abnormal bodies which are needed to ascertain in different stages,the geological guarantee system of high-producing and high-efficient mines is divided into four subsystem,namely,the subsystem of detailed exploration for panel design in mine construction;the subsystem of exploration in panel;the subsystem of detection in fullymechanized working face;and the subsystem of detection in advance and sides of drift excavation.The corresponding matching technology and method associations are presented in ofder to perform the detection tasks for various subsystems.It is necessary that the exploration before mining of fully-mechanized working face in highproducing and high-efficient mines should be standardized as the trade law and regulation.
出处
《煤田地质与勘探》
CAS
CSCD
北大核心
1998年第2期32-34,共3页
Coal Geology & Exploration
关键词
矿井
高产高效
地质勘探
煤矿地质
undergound mine
high-producing and high-efficient
geological exploration
mating
technigue