期刊文献+

Strong NP-Hardness of Single Machine Scheduling Problems with Variable Processing Time

Strong NP Hardness of Single Machine Scheduling Problems with Variable Processing Time
在线阅读 下载PDF
导出
摘要 In this paper, single machine scheduling problems with variable processing time is discussed according to published instances of management engineering. Processing time of a job is the product of a “coefficient' of the job on position i and a “normal' processing time of the job. The criteria considered is to minimize scheduled length of all jobs. A lemma is proposed and proved. In no deadline constrained condition, the problem belongs to polynomial time algorithm. It is proved by using 3 partition that if the problem is deadline constrained, its complexity is strong NP hard. Finally, a conjuncture is proposed that is to be proved. In this paper, single machine scheduling problems with variable processing time is discussed according to published instances of management engineering. Processing time of a job is the product of a “coefficient' of the job on position i and a “normal' processing time of the job. The criteria considered is to minimize scheduled length of all jobs. A lemma is proposed and proved. In no deadline constrained condition, the problem belongs to polynomial time algorithm. It is proved by using 3 partition that if the problem is deadline constrained, its complexity is strong NP hard. Finally, a conjuncture is proposed that is to be proved.
出处 《Journal of Modern Transportation》 1998年第2期78-88,共11页 现代交通学报(英文版)
关键词 single machine scheduling problem variable processing time strong NP hardness. single machine, scheduling problem, variable processing time, strong NP hardness.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部