浙东引水萧山枢纽工程水力特性研究 被引量:4

Study on hydraulic characteristics of Xiaoshan hydrojunction project in eastern Zhejiang
在线阅读 下载PDF
导出
摘要 萧山枢纽为浙东引水工程的关键工程,规划引水量为8.9亿m3/a。该工程的进水口位于感潮河段,水文条件比较复杂。通过物理模型和平面二维数学模型,对进水口引渠布置的合理性进行了论证,并对进水口布置进行了优化,消除了原布置方案引水渠内存在的大范围回流区。对工程运行给上游新坝船闸口门的通航带来的影响程度进行了分析论证,结果表明,该工程运行对上游新坝船闸口门的通航基本没有影响。 Xiaoshan hydrojunction project is an important part of the water diversion project in eastern Zhejiang Province, the programming of water intake is about 890 million cubic metres every year. The arrangement of intake would work on the scheduling policy of water resources in eastern Zhejiang Province. And the project is located at a tidal river, where the hydrological condition is very complex. The physical model and 2 - D hydrodynamic numerical model are developed to study the change of hydrodynamic condition. The optical layout eliminated the large recireulation zone in the initial profile, and the influence of the navigation on Xinba lock is analyzed.
出处 《浙江水利科技》 2009年第1期9-12,共4页 Zhejiang Hydrotechnics
关键词 进水口 物理模型 数学模型 水流流态 浙东引水 萧山枢纽 water intake physical model numerical model flow pattern water diversion project in eastern Zhejiang Province Xiaoshan hydrojunction
作者简介 包中进(1963-),男,教授级高级工程师,大学本科,主要从事水力学研究。Email:bzjin@tom.com
  • 相关文献

参考文献2

二级参考文献4

  • 1[1]包中进等.浙江省曹娥江大闸枢纽工程水力学试验研究总报告[R].浙江省水利河口研究院,2004.
  • 2[4]ZHAO D H, TABIOS III Q Q. and SHEN H W. RBFVM-2D Model, River Basin Two-Dimensional Flow Model Using Finite Volume Method: Program Documentation[M]. University of California, Berkeley, California USA, 1995.
  • 3[5]OSHER S and SOLOMONE F. Upwind difference scheme for hyperbolic systems of conservation laws[J]. mathematical computation,1982, 38:339-374.
  • 4[6]ZHAO D H, SHEN H W, TABIOS Ⅲ G Q,LAI J S and TAN W Y. Finite-volume two-dimensional unsteady-flow Model for River Basins[J]. Journal of Hydraulic Engineer,ASCE,1994,120(7):863-883.

共引文献8

同被引文献15

  • 1徐湘涛,汪家林,黄润秋.紫坪铺水利枢纽工程左岸坝前堆积体变形破坏机制研究[J].岩石力学与工程学报,2008,27(S1):2642-2650. 被引量:25
  • 2潘卫平.扩大杭嘉湖南排杭州三堡排涝工程可行性研究报告[R].杭州:浙江省水利水电勘测设计院,2008.
  • 3沙海飞.曹娥江至宁波引水工程水工模型试验研究报告[R].南京:南京水利科学研究院,2008.
  • 4陈舟,潘卫平.扩大杭嘉湖南排杭州三堡排涝工程三堡泵站进水口流场分析[R].杭州:浙江省水利水电勘测设计院,2009.
  • 5赵汛舟.三堡排涝工程施工期间船闸通航条件及货运影响评估报告[R].杭州:浙江省交通规划设计研究院,2008.
  • 6朱立俊,王建中,范红霞.扩大杭嘉湖南排杭州:堡排涝工程内河侧进水几附近水流条件模型试验研究报告[R].南京:南京水利科学研究院,2009.
  • 7武汉水利电力学院河流泥沙工程学教研室.河流泥沙工程学[S],北京:水利出版社,1981.
  • 8吴乃康.浙江城市防洪问题研究[J].浙江水利水电专科学校学报,2008,20(4):51-54. 被引量:3
  • 9龚丽,白音包力皋,穆祥鹏,肖俊.老龙口水利枢纽鱼道水力特性研究[J].水电能源科学,2015,33(5):73-76. 被引量:4
  • 10吴凌丞,郝楠,赵朋.黄河万家寨水利枢纽排沙钢管冲蚀破坏修复[J].水电与抽水蓄能,2018,4(2):106-111. 被引量:1

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部