摘要
介绍国投新集二矿采用合适的综采设备,首次实现了在综采工作面直接过11 m落差的大断层,避免了重新开切眼倒装综采工作面的复杂生产循环,同时为新集矿区在复杂地质条件下综采工作面的快速高效开采提供理论支持,也为新集矿区综采工作面的设备选型配套提供了依据。
This paper introduce the proper equipment adopted by the second coal mine of Xinji and realizing the fully- mechanized working face rightly corss the 11 meters' big faultage for the first time, and avoiding the complex productive cycle of inverting the working surface. At the same time, it provides the theory support on the quickly and highly effective mining in the complicated geological condition of Xinjin diggings, and offering the foundation for the choosing of the equipment.
出处
《煤炭技术》
CAS
2008年第10期44-45,共2页
Coal Technology
关键词
大倾角
综采工作面
复杂条件
断层
great obliquity
fully - Mechanized working face
complicated condition
faultage
作者简介
张红革(1965-),男,山东金乡人,助理工程师,2001年毕业于北京工业职业技术学院,现任国投新集能源股份有限公司新集二矿综采二队队长,Tel:0554-8669798。