期刊文献+

非齐次缺陷发生率情况下时间延迟模型比较研究 被引量:7

Comparative research on delay-time-based models in case of non-homogeneous defect arrival rate
在线阅读 下载PDF
导出
摘要 为解决缺陷发生服从非齐次泊松过程和故障停机时间较长的问题,提出应用时间延迟理论对预防维修基本模型进行修正,并对设备预防维修间隔期进行优化决策。阐述了时间延迟概念及其维修理论,建立了复杂系统的基本预防维修模型。在此基础上,考虑到设备的故障停机时间较长、缺陷的发生服从非齐次泊松过程情况下合理的维修间隔期会产生相应变化,分别建立了预防维修修正模型I和修正模型II。通过案例研究,比较了预防维修基本模型与修正模型关于确定合理维修间隔期的不同结果。研究表明,修正模型计算出的维修间隔期具有更高的精度。 To deal with problems of how to use the theory of delay time to revise the basic Preventive Maintenance (PM) model and to optimize PM interval of equipment in the case of the Non-Homogeneous Poisson Process (NHPP) of defect arrivals and non-negligible failure downtime. Firstly, the concept of delay time and its maintenance theory were introduced. Then, a basic PM model for complex system was established. Secondly, amendatory model I and model II were established, which was based on the case that failure downtime was short compared to inspection cycle, and the case of NHPP of defect arrivals. Finally, a case study was provided to compare the differences of inspection cycle in basic PM model and the revised PM models. The revised downtime model was a more precise model with which to determine the optimal inspection interval.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第8期1529-1532,共4页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70301002) 上海市重点学科建设资助项目(T0502)~~
关键词 预防维修 设备 时间延迟 非齐次泊松过程 停机时间 缺陷发生率 preventive maintenance equipment delay time non-homogeneous Poisson process downtime defect arrival rate
作者简介 吕文元(1971-),男,浙江永康人,上海理工大学管理学院副教授,博士,主要从事先进制造设备管理的研究。E-mail:wy_lu@sina.com。
  • 相关文献

参考文献10

  • 1潘光,毛昭勇,宋保维,胡海豹,王鹏.预防性维修周期优化决策研究[J].机械科学与技术,2007,26(4):518-520. 被引量:22
  • 2蔡景,左洪福,刘明,耿端阳.复杂系统成组维修策略优化模型研究[J].应用科学学报,2006,24(5):533-537. 被引量:34
  • 3韩帮军,范秀敏,马登哲,金烨.用遗传算法优化制造设备的预防性维修周期模型[J].计算机集成制造系统-CIMS,2003,9(3):206-209. 被引量:33
  • 4CHRISTER A H, LEE C. Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures [J]. International Journal of Production Economics, 2000, 67(1): 77-85.
  • 5CHRISTER A H. Developments in delay time analysis for modeling plant maintenance[J]. Journal of the Operational Research Society, 1999, 50(1): 1120-1137.
  • 6CHRISTER A H, WANG W, BAKER R D. Modeling maintenance practice of production plant using the delay-time concept [J]. IMA Journal of Mathematics Applied in Business & Industry, 1995, 6(1): 67-83.
  • 7CHRISTER A H, WALLER W M. Delay time models of industrial inspection maimenanee problems[J]. Journal of the Operational Research Society, 1984, 35(5): 401-406.
  • 8CHRISTER A H, WALLER W M. Reducing production downtime using delay time analysis [J]. Journal of the Operational Research Society, 1984, 35(6): 499-512.
  • 9吕文元,朱清香,方淑芬.利用故障数据和估计的检查数据建立维修优化模型[J].数学的实践与认识,2007,37(10):83-89. 被引量:5
  • 10BAKER R D, SCARF P A, WANG W. A delay time model for repairable machinery--maximum likelihood estimation of optimum inspection interval[J]. IMA Journal of Mathematics Applied in Business and Industry, 1997(8) :83-92.

二级参考文献33

  • 1毛昭勇,宋保维,李正,胡海豹.并联系统预防性维修费用的优化方法[J].系统仿真学报,2005,17(4):819-821. 被引量:10
  • 2王彤.空调器寿命的可靠性分析探讨[J].家电科技,2005(6):49-51. 被引量:1
  • 3邹小理.结构的最优预防性维修周期[J].航空学报,1997,18(3):363-366. 被引量:8
  • 4TAN JONATHAN S, KRAME MARK A. A general framework for preventive maintenance optimization in chemical process operations[J]. Computers Chemical Engineering,1997, 21(12): 1451-1469.
  • 5DEDOPOULOS I T, SMEERS Y. An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failure[J]. Computers & Industrial Engineering,1998, 34(3): 643-654.
  • 6METWALLI SAYED M, SALAMS MONA S. Computer aided reliability for optimum maintenance planning[J]. Computers&Industrial Engineering,1998,35(3): 603-606.
  • 7BARLOW R, HUNTER L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8: 90-100.
  • 8RICHARD C C,MURDOCK W P J. Selective maintenance for support equipment involving multiple maintenance actions[J]. European Journal of Operational Research,2001, 129:252-258.
  • 9CHAO Ton Su, SUNG Chiwu. Multi-action maintenance subject to action-dependent risk and stochastic failure[J]. European Journal of Operational Research, 2000, 125(1): 133-148.
  • 10GHARBI A, KENNE J P. Production and preventive maintenance rates control for a manufacturing system: an experimental design approach[J]. Int.Jour.Production Economics, 2000, 65: 275-287.

共引文献84

同被引文献54

  • 1韩帮军,范秀敏,马登哲.生产系统设备预防性维修控制策略的仿真优化[J].计算机集成制造系统,2004,10(7):853-857. 被引量:9
  • 2叶凯.自动线设备维修方式探讨[J].设备管理与维修,1994(1):35-35. 被引量:1
  • 3蔡景,左洪福,刘明,耿端阳.复杂系统成组维修策略优化模型研究[J].应用科学学报,2006,24(5):533-537. 被引量:34
  • 4陶俐言,孔繁森.发动机缸体生产线同步维修策略研究[J].计算机集成制造系统,2006,12(7):1090-1094. 被引量:4
  • 5Budai, G. , Dekker, R. , Nicolai, R.P.. Maintenance and Production: A Review of Planning Models [M]. In: Murthy DNP, Kobbacy AKS, editors, Complex System Maintenance Handbook, Springer Series in Reliability Engineering, 2008, Part D: 321- 344.
  • 6aker, R. D. , Christer, A. H.. Review of delay-time OR modelling of engineering aspeets of maintenanee [J]. European Journal of Operational Research, 1994, 73(3) : 407-422.
  • 7Dekker, R. , Scarf, P. A.. On the impact of optimization models in maintenance decision making: the state of the art [J]. Reliability Engineering and System Safety, 1998,(60) :111-119.
  • 8Sherwin, D.. A review of overall models for maintenance management [J]. Journal of Quality in Maintenance Engineering, 2000, 6(3): 138-164.
  • 9Christer, A. H.. Developments in delay time analysis for modelling plant maintenance[J]. The Journal of the Operational Research Society, 1999, 50 (11) : 1120-1137.
  • 10Wang, W.B.. Delay Time Modelling [M]. In: Murthy DNP, Kobbacy AKS, editors, Complex System Maintenance Handbook, Springer Series in Reliability Engineering, 2008, Part D: 345-370.

引证文献7

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部