摘要
以龙滩4号机为例介绍了龙滩电站调速器试验目的、方法及步骤,并对开、停机试验、空载及甩负荷等试验进行了分析,为类似特大型水电站调速器调试试验积累了经验。
This paper gives an introduction to the purpose, method and steps of the governor test of Longtan Hydropower Plant and makes an analysis of the starting, shutdown, no - load and load rejection tests by taking No. 4 turbine - generator unit for example, thus having accumulated experiences of governor test for large hydropower plants of this kind.
出处
《云南水力发电》
2008年第4期8-12,共5页
Yunnan Water Power
关键词
龙滩电站
调速器
试验
Longtan hydropower plant
governor
test
作者简介
唐扬文(1967-),男,四川华蓥人,高级工程师,机电安装分局总工程师,主要从事水电机组安装调试及技术管理工作。