期刊文献+

杂木寺水电站水工及泥沙模型试验研究 被引量:1

Model test of hydraulics and sediment of Zhamusi hydropower stationt
在线阅读 下载PDF
导出
摘要 针对杂木寺水电站枢纽布置、泄水建筑物进口及消能工的体型优化、库区拉沙以及下游河道的消能防冲等问题进行了41个方案的试验研究和论证分析,通过在电站进口加设导沙坎、在泄洪冲沙闸末端加设小挑坎以及在消力池右边墙出口段加设导流墩等措施,较好地解决了库区拉沙问题及枢纽的泄洪消能问题。提出的推荐方案具有体型简单,易于施工,操作灵活、工程量小、下游河道冲刷较浅等优点,达到了泄洪消能试验的目的,满足了设计要求,并被应用于工程设计中。 In view of Zhamusi project structure arrangement, shape optimization of release structure inlet and dissipator, as well as reservoir sediment discharge and energy dissipation and erosion control of downstream channel, tests and analysis are made on 41 alternatives. By adding a silt an'ester at the intake and a small flip bucket at the end of the flood discharging and sand sluicing gate or adding a diversion pier at the outlet section of the right wall of stilling basin, the issue of reservoir sediment discharge and structure energy dissipation is well solved. The proposed alternative, with the advantages of simple shape, easy construction, flexible operation, small work quantity and shallow erosion in downstream channel, has reached the objectives of flood discharging and energy dissipation tests, met the design requirements and been applied in project design.
出处 《西北水电》 2008年第3期60-64,共5页 Northwest Hydropower
关键词 导沙坎 导流墩 消力池 泄洪消能 库区拉沙 试验研究 silt arrester diversion pier stilling basin flood discharging and energy dissipation reservoir sediment discharge test
作者简介 卫勇(1962-),男,陕西省华阴市人,工学硕士,教授级高级工程师,从事水工水力学研究.
  • 相关文献

参考文献7

二级参考文献2

共引文献35

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部