期刊文献+

大跨径连续刚构桥施工控制中的混凝土徐变分析 被引量:26

The Analysis of Concrete Creep of Construction Control for Long Span Continual Rigid Frame Bridge
在线阅读 下载PDF
导出
摘要 新寨河特大桥是一座大跨径连续刚构桥,其最大跨径达到230 m。建立了桥梁有限元计算模型,按新、旧《规范》考虑混凝土徐变的方法和不考虑混凝土徐变等3种情况,分析了箱梁悬臂施工过程中的挠度与内力,比较了箱梁施工预拱度。并现场实测了相关数据。 Xinzhaihe Bridge is designed as a long-span continuous rigid-frame bridge with its lon- gest span reaching 230m. This paper builds a calculation model for bridges using finite element method, which can help to analyze the effects of deflection and inner force as the process of the box beam cantilever construction, and also compare the pre-camber as the process of the box beam construction according to three conditions between non-consideration of concrete creep and consideration of concrete creep based on the new and old criteria, Some correlation data are field test.
出处 《公路工程》 2008年第1期32-35,共4页 Highway Engineering
基金 中南林业科技大学人才引进启动项目(06Y027)
关键词 连续刚构桥 混凝土徐变 悬臂施工 预拱度 Continual rigid frame bridge Concrete creep Cantilever construction camber
作者简介 朱宇锋(1981-),男,湖南宁乡人,硕士研究生,主要从事大跨桥梁结构分析和施工监控研究。
  • 相关文献

参考文献5

二级参考文献3

共引文献387

同被引文献135

引证文献26

二级引证文献110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部