一种计算工作时间参数新方法

A New Method for Calculating Work Time Parameters
原文传递
导出
摘要 为了编制和优化施工进度计划,计算构成施工项目的各项工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差和自由时差等时间参数十分重要.提出了一种计算工作时间参数新方法.该方法以工作完成时间为决策变量,通过建立和求解线性规划模型来得到各种工作时间参数.其建模思路清晰,不需绘制网络图,能用通用办公软件EXCEL求解.模拟计算表明,用该方法与用标准网络计划技术计算出的工作时间参数完全一致. In order to prepare and optimize construction schedule plan, the calculation of earliest start time, latest start time, earliest finish time, latest finish time, total float and free float of the project's works is very important. In this paper, a new method for calculating work time parameters is put forward. Under this method, the various work time parameters can be obtained by establishing and solving the linear programming models whose decision variables are work finish times. The modeling thought of the new method is very clear, drawing network diagrams is not needed, and the linear programming models can be easily solved using the general office software EXCEL. The simulation calculations show that the work time parameters obtained using this new method and those obtained using the network scheduling technique are altogether in agreement.
作者 宇德明
出处 《数学的实践与认识》 CSCD 北大核心 2008年第6期73-79,共7页 Mathematics in Practice and Theory
关键词 工程管理 工作时间参数计算 线性规划模型 施工进度计划 EXCEL软件 engineering management work time parameter calculation linear programming models construction schedule plan EXCEL software
  • 相关文献

参考文献4

二级参考文献3

  • 1余鄂西.科技中的矩阵理论[M].武汉:华中理工大学出版社,1996..
  • 2张起森 王首绪.公路施工组织及概预算[M].北京:人民交通出版社,1998..
  • 3吴鼎贤编著.建筑工程现代管理量化与优化方法[M]. 地震出版社, 1999

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部