期刊文献+

浅谈水利水电工程造价的有效控制 被引量:18

Discussion on Effective Control for Cost of Water Conservancy and Hydropower Projects
在线阅读 下载PDF
导出
摘要 由于水利水电工程建设工期长、投资大且受自然环境和地质因素影响较大,因此如何进行水利水电工程造价的有效控制成为关键性的问题。通过对建设项目投资决策阶段、设计阶段、实施准备阶段及实施阶段,对涉及工程造价控制的可行性研究估算、初步设计概算、合同价、工程结算价、竣工决算等有关内容进行了一定的分析和探讨,提出了实现建设项目工程造价有效控制的主要途径,以期对投资者控制造价能有一定的借鉴意义。 Because of the long engineering time, the large investment and the great influence trom the natural environment and geological condition of a water conservancy and hydropower project, it is a key problem how to effectively control the project cost. Such the contents as the feasibility study and evaluation, rough estimation of preliminary design, contract price, project settling-account price, final account of project finish and so on are analyzed and discussed during the decision-making stage, design stage, preparation stage and the implementation stage for a project. At last, the main ways to control the project cost effectively are put forward.
作者 成莉
出处 《水利与建筑工程学报》 2008年第1期109-110,118,共3页 Journal of Water Resources and Architectural Engineering
关键词 水利水电工程 造价控制 决策阶段 设计阶段 water conservancy and hydropower project cost control decision-making stage design stage
作者简介 成莉(1973~),女(汉族),贵州贵阳人,工程师,在读工程硕士,长期从事水利水电工程造价及经济评价工作。
  • 相关文献

参考文献3

二级参考文献4

  • 1宋俊岳 周芹.项目管理与建设监理[M].北京:企业管理出版社,1990..
  • 2宋俊岳,项目管理与建设监理,1990年
  • 3周祥源,基本建设技术经济学,1986年
  • 4白瑛,建筑企业经营管理,1980年

共引文献13

同被引文献33

引证文献18

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部