摘要
喜河水电站属二等工程,最大坝高62.8 m,在设计工作中因地制宜较好地解决了一些难度较高的问题,其中涉及到大坝的问题有:混凝土配合比设计问题、“低水头、大单宽、高尾水”的泄流消能问题、预应力闸墩设计问题、表孔坝段深层抗滑问题等。
The Xihe hydropower station is a grade Ⅱ project, the height of its dam is 62.8 m. Some difficult problems were solved in the design of the project, concerning concrete mixture ratio, energy dissipation of flood discharge with the features of low water head, large discharge per unit width, high tail water table, design of pier with prestressed concrete, skid resistance of d surface outlet am section, and so on.
作者
乔明秋
陈晴
杨健
于来广
王勇
QIAO Ming - qiu, CHEN Jing, YANG Jian, YU Lai - guang, WANG Yong (Beijing Survey and Design Institute, Beijing 100024, China)
出处
《西北水力发电》
2007年第3期40-43,共4页
Journal of Northwest Hydroelectric Power
作者简介
乔明秋(1959-),男,陕西大荔人,北京勘测设计研究院教授级高级工程师,副总工程师,喜河电站设计项目经理。