某热电厂安装3台SHF-35-39/450型沸腾炉,为了提高经济效益,将沸腾炉改为循环流化床锅炉,改造后,由于锅炉采用平面流分离器,分离效率低,锅炉存在达不到额定出力等问题。又对1号锅炉进行了第二次技术改造,锅炉出力由35t/h提高到42t/h,达到设计要求。
There were three SHF- 35 -39/450 fluidized bed boilers in a power plant, the boilers were reformed into circulating fluidized bed boilers for enhancing economical benefit. After reformation, because the efficiency of plate seperators was low,they were reformated again, the maximum continuous rating of boilers was increased from 35 t/h to 42 t/h.